CONTROL PANEL
Page 16
SECTION 5 - PIPE INSTALLATION
5:1 PIPE DUCT
With the boiler in the desired location, mark the wall where the pipes are to pass through. Using a 100mm
core drill, drill through wall taking care not to damage any damp proof membrane. Using the EDPM seal, fix
the pipe duct plate to the side panel using the nuts and washers provided. Push the ducting through the seal
and into the wall. The duct can be cut if required. The use of a high modulus silicon with provide a very good
seal between the brickwork and the duct.
Page 24 of 40
Camray 5 External Boilers
14/04/2005
file://D:\PL61000\PL61000.htm