
Page
22
of
28
EM-NRV NORTH AMERICAN SUPPLEMENTAL MANUAL - V2016NRV-ELE
Wiring O-EM-NRV-DLS (Dust Level Sensor) to
O-EM-NRV-CP02 Intrinsic Panel
1.
On the Wiring diagram you will
notice the Dust Level Sensor will
be installed inside the physical
barrier in the control panel.
2.
Connect brown wire to the
terminal labeled 1.
**NOTE** The Bottom Row is
Labeled 1-2-3 and Top Row is
Labeled 4-5-6
3.
Connect blue wire to the
terminal labeled 4.