6.
Remove the horizontal hinge pin, flat washer,
and top locknut from the blade center (
).
g271616
Figure 6
1.
Horizontal hinge pin
3.
Flat washer
2.
Pushframe
4.
Top locknut
7.
Slide the pushframe into the blade center
(
).
8.
Apply threadlocking compound to the previously
removed horizontal hinge pin, flat washer, and
top locknut, and secure the pushframe to the
blade center with them (
Note:
If the plow will be heavily used, welding
the top locknut to the hinge pin is recommended.
9.
Torque the horizontal hinge pin to 153 N∙m (113
ft-lb).
Installing the Trip Springs
and Hydraulic Cylinders
1.
Secure the rod end of the lift cylinder to the
push-frame assembly using a clevis pin (5/8
inch) and hairpin cotter (
Note:
Ensure that the hose port on the bottom
of the lift cylinder is facing up.
g271617
Figure 7
1.
Clevis pin (5/8 inch)
3.
Lift cylinder
2.
Hairpin cotter
2.
Hook the spring yoke to the cross rod inside the
blade center (
g285258
Figure 8
1.
Spring yoke
4.
Washer (5/8 inch)
2.
Trip spring
5.
Top nut (5/8 inch)
3.
Eyebolt
3.
Hook the 4 trip springs through the holes in the
spring yoke (
).
4.
Hook the other ends of the trip springs to 4
eyebolts (
).
5.
Insert the threaded end of the eyebolts through
the holes on the pushframe and secure them
using 4 washers (5/8 inch) and 4 top nuts
(
).
6.
Secure the 2 angle cylinders to the blade center
using a bolt (5/8 inch) and top locknut (
).
Note:
Ensure that the hose port on the angle
cylinders is facing up.
8
Summary of Contents for RT3 DXT
Page 28: ...Schematics g272184 Plow Side Electrical Schematic Rev 0 28...
Page 29: ...g272185 Truck Side Electrical Schematic Rev 0 29...
Page 34: ...Notes...
Page 35: ...Notes...
Page 36: ......