8 - ShowMatch

TM

 DeltaQ

TM

 Array Rigging Frames - Installation Guide

Installation

pro.Bose.com

To connect a ShowMatch Array Frame or T-Bar Array Frame to a full-range loudspeaker module:

1.  Use Bose® Modeler® software or the Bose Array Tool to determine appropriate rigging points on array 

frames for required aiming angles, and to confirm that array does not exceed load limits of frame. For 

more information on Modeler and the Bose Array Tool, see 

pro.Bose.com

.

2.  Place array frame directly under chain motors.
3.  Attach included frame shackle adapters to array frame at rigging points determined by software.
4.  Lower chain motors and attach chains to shackle adapters installed on array frame.
5.  Raise array frame to a height slightly greater than that of the first (top) module to be installed.
6.  With one person per side, place first module directly under suspended array frame.
7.  Raise the links on module: Remove the pins, slide the link switch from the STOW position to the LINK 

position, and replace the pins. See Fig. 1.

8.  Lower array frame onto first module.
9.  Adjust module position to align pin holes of module and frame.
10. Insert two front pins (one on each side), then insert rear center pin to secure module to frame. See Fig. 

2.

11. Raise array frame to a height slightly greater than that of the next module.
12. With one person per side, place next module directly under suspended array.
13. Lower array onto next module.
14. Align pin holes of second (bottom) module to pin holes of first (top) module.
15. Insert two front pins (one on each side), then insert rear center pin to secure .
16. Repeat steps to install additional modules in the array. Do not exceed load limits of frame.
17. Connect field wiring, test loudspeaker operation, and then elevate array assembly to final operating 

position.

Fig. 1. Raise links on module

Fig. 2. Insert pins to attach module to frame

Summary of Contents for ShowMatch DeltaQ SMAF

Page 1: ...ShowMatchTM DeltaQTM Array Rigging Frames Installation and Safety Guidelines...

Page 2: ...y regulatory compliance system performance and may void the warranty NOTE Always use Bose Modeler or Bose Array Tool software to confirm safe working load limits with exact array configurations pitch...

Page 3: ...ofer modules or to create ground stack arrays Array Pullback Bracket Connect the ShowMatch Array Pullback Bracket SMPULL to the bottom full range array module to provide third point suspension to buil...

Page 4: ...s ShowMatchTM Array Frame SMAF Product Weight 83 0 lbs 37 6 kg Product weight includes one shackle adapter Each shackle adapter is 1 5 lbs 0 7 kg ShowMatch Array Frame SMAF Center Rail WLL 1800 lbs 81...

Page 5: ...com ShowMatchTM T Bar Array Frame SMAFT Product Weight 40 5 lbs 18 4 kg Product weight includes one shackle adapter Each shackle adapter is 1 5 lbs 0 7 kg ShowMatch T Bar Array Frame SMAFT Center Rai...

Page 6: ...MatchTM Array Pullback Bracket SMPULL Product Weight 15 lbs 18 4 kg ShowMatch Array Pullback Bracket SMPULL Center Suspension Point WLL 700lbs 315 kg ShowMatch Array Pullback Bracket SMPULL Side Suspe...

Page 7: ...ints for full range modules two front corners and a center location Each side rail provides 21 rigging points labeled according to the image printed on the frame The center rail provides seven rigging...

Page 8: ...t module directly under suspended array frame 7 Raise the links on module Remove the pins slide the link switch from the STOW position to the LINK position and replace the pins See Fig 1 8 Lower array...

Page 9: ...me at rigging points determined by software 4 Lower chain motors and attach chains to shackle adapters installed on array frame 5 Raise array frame to a height slightly greater than that of the subwoo...

Page 10: ...nd working load is within acceptable safe limits For more information on Modeler and the Bose Array Tool see pro Bose com Note The Pull Back Bracket is not intended to provide primary structural suppo...

Page 11: ...ntro Leoni A Via G Spadolini 5 20122 Milano Italy 39 02 36704500 Japan Bose Kabushiki Kaisha Sumitomo Fudosan Shibuya Garden Tower 5F 16 17 Nanpeidai cho Shibuya Ku Tokyo 150 0036 Japan TEL 81 3 5489...

Page 12: ...2016 Bose Corporation The Mountain Framingham MA 01701 9168 USA AM772786 Rev 00...

Reviews: