7
Regulations
6 720 612 217 (05.03)
2
Regulations
This accessory conforms to the rele-
vant EN regulations.
The following regulations and require-
ments must be observed:
• Requirements and regulations of the
relevant local electricity supplier
• Trade and fire safety requirements
and regulations.
The installation of the Worcester Solar
System and controller must be carried
out in accordance with the relevant
requirements for safety, current
IEE wiring regulations, local building
regulations, building standards (Scot-
land) (Consolidation) regulations,
health and safety document No 635
(Electricity at Work Regulations 1989),
BS 5918: Latest version.
3
Installation
3.1
Installing the controller
When installing the controller, refer to
Figs. 6 and 7 on page 17.
B
Select a suitable installation site.
B
Remove the top part of the controller
cover.
B
Drill the top fixing hole.
B
Insert screw into hole.
B
Locate top fixing hole in controller
backplate over screw.
B
Mark position of bottom fixing holes.
B
Remove controller again.
B
Drill bottom fixing holes.
B
Relocate programmer over top
screw.
B
Insert screws in bottom holes and fix
programmer in position.
B
Refit top part of programmer.
Danger:
risk of elec-
tric shock!
B
Before installing this
accessory:
Disconnect the pow-
er supply (230 V AC).
i
The controller can be fit-
ted directly onto cable
trunking.