INSTALLATION
6 720 804 107 (2012/10)
6
Fig. 10 Separate points of isolation
[1]
Fused spur
[2]
Greenstar Wiring Centre
[3]
Greenstar boiler
1)
To do the electrical connections the cover of the module has to be
removed.
▶ Only use cable of comparable quality.
▶ Ensure the power supply is connected to the Live, Neutral and Earth
terminals.
ELECTRICAL CONNECTION - STEP 1
1. Remove grommets from the module.
2. Route cable through a grommet.
3. Remove plug from the socket.
4. Connect cable to plug and ensure it is connected to the right terminals
(
5. Route cable through the same grommet.
6. Remove plug from the socket.
7. Connect cable to plug and ensure it is connected to the right terminals
(
Fig. 11 Electrical connection - step 1
ELECTRICAL CONNECTION - STEP 2
1. Put the grommet used in step 1 into the socket.
2. Plug in first connected plug from where it was removed.
3. Plug in second connected plug from where it was removed.
Fig. 12 Electrical connection - step 2
ELECTRICAL CONNECTION - STEP 3
1. Remove grommets from the module.
2. Route cable through a grommet.
3. Remove plug from the socket.
4. Connect cable to plug and ensure it is connected to the right terminals
(
5. Route cable through the same grommet.
6. Remove plug from the socket.
1) Refer to the Installation, Commissioning and Servicing instructions of the
compatible Greenstar boiler for specific wiring connections of the boiler.
Never exceed the maximum power consumption of the
system components as specified (
page 3).
▶ As the power supply is not provided via the electronic
circuitry of the heating appliance, install a circuit
breaker complying to the applicable standards to
interrupt all phases of the power supply (acc. to
EN 60335-1).
. . . . .
N L
120/230VAC
L
N
1
2
BUS
1
2
BUS
N L
120/230VAC
. . . . .
L
N
6 720 804 107-22.1O
2
3
1
1
2.
1.
5.
5.
7.
7.
6.
6.
≥ 20
3.
4.
6 720 804 106-09.1O
1.
2.
3.
6 720 804 106-10.1O