64 / 72
MS2N
Bosch Rexroth AG
R911347581, Edition 05
Remark:
The permanent magnets of the rotor
or secondary part must be demagnetized before
disposal to avoid injuries or damage.
The demagnetization is reached via special
thermal treatment. The handling duration is influ-
enced by the rotor frame size. The rotor or the
secondary part has to remain in the oven for a
minimum of 30 minutes, starting at the time,
the magnetic surface has reached 300 °C. If the
magnets are surrounded by a bandage or a cover
plate, it is recommended to remove it before
heating in the oven to expose the magnets.
If demagnetization is successful, the magnets can
be separated from the rotor or secondary part
after cooling without applying force.
Packaging
Our packaging materials do not contain any prob-
lematic materials and can therefor be easily dis-
posed. Packaging materials are: wood, cardboard
and polystyrene.
Batteries and accumulators
The symbol indicating "separate collection" for
all batteries and accumulators is the crossed-out
wheeled bin. End users in the EU are legally
bound to return used batteries and accumula-
tors. Outside the scope of the EU Directive
2006/66/EC, the applicable regulations must
be followed. Batteries and accumulators can con-
tain hazardous substances which can harm the
environment or people's health when improperly
stored or disposed of. The batteries or accumu-
lators must be returned to the country-specific
collection systems for proper disposal.
Disposal by the manufacturer
Our products can be returned to us for disposal.
However, this requires that the products are free
from oil, grease or other dirt. The motor compo-
nents must be returned in a suitable packaging
(origin package if possible). In the case of a
transport by air freight, please observe the dan-
gerous goods regulations (IATA) for the secon-
dary part.
Send the products to the following address, car-
riage free:
Bosch Rexroth AG
Bgm.-Dr.-Nebel-Str. 2
97816 Lohr a.Main, Germany
12
Eliminate malfunction
As a matter of principle, the instructions in the
project planning and commissioning manuals
must be followed in case of failures and errors.
Contact the manufacturer, if necessary.