- 3 -
INITIAL PREPARATIONS
Determine the operating voltage at the
installation site. The camera has been pre-
wired for 12Vdc or 24V ac operation before
shipment.
See Section 2 – Input Power
Connections.
Determine the optimum location for the
camera.
See Section 4 - Camera Mounting
All cameras have been tested prior to
shipment. After the wiring has been
reconnected, it is advisable to check the
camera’s operation before installation.
GUIDELINES
The installation of the
EX10
camera is explained
in Sections 1 to 4 listed below.
It is important that these steps are followed in
sequence:
1. Housing Separation
2. Input Power Connections
3. Camera Re-Assembly
4. Camera Mounting
Summary of Contents for EX10
Page 11: ... 5 FIGURE 1 1 Housing Step 1 1 Screw Removal ...
Page 12: ... 6 FIGURE 1 2 Housing Step 1 2 Housing Separation ...
Page 15: ... 9 FIGURE 3 1 Camera Housing Re assembly Steps 3 1 3 2 3 3 ...
Page 17: ... 11 FIGURE 4 1 Mounting Bracket ...
Page 18: ... 12 FIGURE 4 2 Camera mounting ...
Page 22: ...Note ...
Page 23: ...Note ...