1 689 975 254
2014-01-14
|
Robert Bosch GmbH
22 | CRR 120 | CRR 120 design
en
5.2
Pneumatic system diagram
Fig. 4:
CRR 120 pneumatic system diagram
A
Pressure connection P1/P2 (outlet)
A1
Display module (voltmeter)
B
Pressure connection Po
P
In
Pressure connection (inlet)
ED02
Pressure control valve
Po
Mechanical pressure gage
PM1
Pressure switch
P WIKA Pressure sensor
Vol
Hose (2 m) as control volume
WAP 3/2 Inlet valve with red actuator
WST 5/2 Valve with white actuator
Summary of Contents for CRR 120
Page 2: ......