A D00 A49 029
|
2017-06-09
Robert Bosch Engineering and Business Solutions Private Limited
|
3.10
Post installation Acceptance checklist
Sl. No.
Description
Test Passed
(Yes/No/NA)
Comments
1
Torque measurement and record of the mounting
-
Mounting bracket
-
Splash guard
-
CO2 Sensor assembly
-
UV sensor assembly
-
Solar Shade
2
Ensure mating connectors and dust caps should be in locked condition
3
Connection details (Ethernet/
3
G)
4
Switch on the unit and observe blinking of the red LED
5
Ensure the device updating the data on the cloud verified by customer
using their system
6
Picture of installation in four direction
7
Details of the four direction at the location
North
East
West
South
Pre Installation | 11