Commissioning Step by Step
4–1
1070 072 262-101 (01.09) GB
4
Commissioning Step by Step
The commissioning step by step describes the connection of a CL550 via the
TCP/IP protocol. The set values and addresses are transmitted into the sys-
tem controller using the project configurator.
Communication via the TCP/IP protocol takes place in a
D
single processor system via the ZS550, see page 4–3.
D
single processor system via the CON550 module, see page 4–7.
D
multiple processor system via the respective ZS550, see page 4–11.
D
multiple processor system via the CON550 module, see page 4–18.
Prerequisites
The following prerequisites have to be fulfilled for commissioning step by
step:
D
The components are physically connected with each other. For the
ZS550 it is necessary to take care that:
D
the data terminal equipment (PC, ZS550) has an MDI port
D
switches, hubs etc. have MID-X ports and a reversible port.
Depending on the communication parameters, a patch or cross-over cable
has to be used.
Device 1
MDI
MDI-X
Device 2
MDI
Cross-over cable
Patch cable
MDI-X
Patch cable
Cross-over cable
D
The configuration file is defined in the project configurator
D
The configuration of the PROFIBUS-DP is created in WinDP
D
The PLC program is created with WinSPS