46
en | Installation
AVENAR panel
2022-07 | 5.0 | F.01U.378.910
System manual
Bosch Sicherheitssysteme GmbH
!
Caution!
EN 62368-1: MS 3. The installation height is recommended to a maximum of 2 m.
Functional Modules
–
Functional modules are encapsulated; the connection terminals are protected against
static discharge.
Building Management System
–
If connected to a building management system (Bosch Building Integration System BIS)
via an Ethernet interface using an OPC server, the following must be noted:
In a multi-building network, it is essential to clarify with the network administrator
whether the network is designed for multi-building connections (e.g. no interference due
to differences in grounding potential).
Documentation
–
The current and full product documentation can be found at www.boschsecurity.com.
–
For those with access rights, the current wiring guide can be found on the extranet. This
contains information about the wiring of the functional modules and the peripheral
devices.
–
A printed short user guide in all relevant national languages with information on the most
important functions on access level 1 and 2 is supplied with the panel controller. A
detailed user guide containing all relevant information on operating and configuring the
panel can be found at www.boschsecurity.com.
Store the documents in a safe place near the panel.
4.2
Installation sequence
1 Keep to hand:
–
The installation instructions supplied with the relevant components (housing, frame,
cables etc.)
–
The required tools.
An overview of the required tools can be found in the installation instructions.
2 Preparation
–
Lay the pre-cabling.
–
Optional: network cabling.
3 Installation of housing
Installation of wall mounting housing
Install:
–
Housing
–
Optional: accessories for housing
–
Power supply bracket
–
Power supply unit and batteries
–
Panel rail
–
Panel controller
–
Functional modules
Installation of frame installation housing
Install:
–
Mounting frames
–
Housing