Commissioning
19
Air Center Control – 6720892132 (2021/10)
4
Commissioning
Overview of the commissioning steps
1. Installation and electrical wiring of all VRF system
components (outdoor units, indoor units, etc.
follow the instructions for the system components).
2. Commissioning of system components.
To ensure fault-free communication between the central
controller and variable refrigerant flow system components:
▶ Bring indoor units into operation first, followed by the
outdoor units.
▶ System type AF 6300: when connecting to the power
supply/switching on, observe the sequence indoor unit,
S-Box then outdoor unit.
Only perform the system scan 15 minutes after switching the
outdoor units on.
When commissioning the outdoor units, it is advisable not to
change the default setting at the selector switch for selecting
the central controller to be used to avoid communication
problems between the central controller and VRF system.
▶ Commissioning the central controller via the configuration
wizard (
Chapter 4.1, page 19).
▶ Performing settings in the configuration wizard of the
central controller (
Chapter 4.1, page 19).
▶ System handover (
4.1
Configuration wizard
The configuration wizard starts automatically the first time the
central controller is operated after establishing the connection
with the power supply.
▶ Follow the instructions of the configuration wizard step-by-
step.
The following configurations can be made:
•
Select language, country, time zone, date and time
•
Restore saved settings
•
Perform software updates
•
Create new admin user
•
Start system scan
The first user account to be set up is a user account with
administrator rights. Once the administrator account has been
set up, the administrator can create new user accounts and
assign user roles.
National data protection regulations must be observed when
creating the user accounts (
“Observe and comply with data
protection notices for the operator” in the operating
instructions).
4.2
Recommended system configuration
Once the configuration wizard is complete, we recommend
making the following settings in the main menu:
Table 5
Recommended system configuration
The settings listed can be accessed via the page
Dashboard
(
5
First steps
Once a scan has been performed, page
System structure
appears. Page
Dashboard
should be called up afterwards as a
recommendation.
To call up the page
Dashboard
:
▶ Select header >
.
Dashboard
appears.
All software functions can be accessed from here. Important
and the most frequently used functions are displayed as tiles.
Menu
Adjust
User management
Create user and assign access
rights.
Notice:
observe data
protection notices for the operator
in the operating instructions.
Network settings
Configure connections.
Screen
Adjust brightness, switch-off time,
etc.