![Bosch 7 735 500 7848 Installation And Maintenance Instructions For Contractors Download Page 26](http://html.mh-extra.com/html/bosch/7-735-500-7848/7-735-500-7848_installation-and-maintenance-instructions-for-contractors_52766026.webp)
W 120-5 O – 6 720 819 306 (2018/10)
26
Regulations
2.6
Product information
3
Regulations
Observe the following guidelines and standards:
• Local regulations
•
EnEG (Building Regulations)
(in Germany)
•
EnEV (Energy Savings Order)
(in Germany)
Installation of, and equipment for, heating and water heating systems:
•
DIN
and
EN
standards
–
DIN 4753-1
– Water heaters ...; requirements, identification,
equipment and testing
–
DIN 4753-3
– Water heaters ...; corrosion protection on the
water side through glass lining; requirements and testing
(product standard)
–
DIN 4753-6
– Water heating systems ...; cathodic corrosion
protection for enamelled steel cylinders; requirements and
testing (product standard)
–
DIN 4753-7
– Water heaters...; containers with a volume up to
1000 l, manufacturing, thermal insulation and corrosion
protection requirements
–
DIN EN 12897
– Water supply - regulation for ... DHW cylinders
(product standard)
–
DIN 1988-100
– Technical rules for potable water installations
–
DIN EN 1717
– Protection of potable water against
contamination ...
–
DIN EN 806
– : Technical rules for potable water installations
–
DIN 4708
– Central water heating systems
•
DVGW
– Code of Practice W 551 – Potable water heating systems
and pipework; technical measures to inhibit the growth of
legionella bacteria in new systems; ...
– Code of Practice W 553 – Sizing DHW circulation systems ... .
4
Transport
▶ Secure the DHW cylinder during transportation to prevent it from
falling.
▶ Move packed DHW cylinder with a sack trolley and lashing strap
(
-or-
▶ Move unpacked DHW cylinder with a transport net; during handling,
protect connections against possible damage.
5
Assembly
The DHW cylinder is delivered fully assembled.
▶ Check that the DHW cylinder is complete and undamaged.
5.1
Installation
5.1.1
Requirements for installation location
▶ Place the DHW cylinder on a plinth if there is a risk of water collecting
at the installation location.
▶ The installation site must be a dry and frost-free room.
▶ Observe minimum room height (
installation location. No minimum wall clearance required.
5.1.2
Positioning the DHW cylinder
▶ Stand the DHW cylinder upright and level it (
▶ Remove the caps.
▶ Apply Teflon tape or Teflon string (
5.2
Hydraulic connections
Item
Description
1
Casing, painted sheet metal with rigid polyurethane foam
thermal insulation, 30 mm
2
Built-in magnesium anode, without electrical insulation
3
Heat exchanger for reheating by wall mounted boiler,
smooth enamelled tubing
4
Sensor pocket for temperature sensor, heat source
5
Storage cylinder, enamelled steel
6
Inspection aperture for maintenance and cleaning on the
top/DHW circulation connection
7
PS top cover
8
Cylinder flow
9
DHW outlet
10
Cold water inlet
11
Cylinder return
12
Drain valve
Table 6 Product description (
NOTICE:
Risk of damage from inadequate load-bearing
capacity of the installation surface or unsuitable floor
surface!
▶ Ensure that the installation surface is level and offers
sufficient load-bearing capacity.
WARNING:
Risk of fire from soldering and welding!
▶ Take appropriate safety measures when soldering
and welding as the thermal insulation is flammable.
For example, cover up the thermal insulation.
▶ Check cylinder jacket for damage after completing
work.
WARNING:
Risk of injury from contaminated water!
Work carried out without due care for cleanliness
contaminates the potable water.
▶ Install and equip the DHW cylinder hygienically in
accordance with national standards and guidelines.