background image

05/20

 

BTSJ20TB

 

 

                

Made in China to TQB Brands Pty Ltd specifications 

 

P a g e

 | 

5

 

Visit us at www.tqbbrands.com.au

 

 

WARNING

  

Never wire, clamp or otherwise disable the lift control valve to function by any means other than by 
using the operator's hand.  Use the handle provided with this product or an authorised replacement 
handle to ensure proper release valve operation.  Do not use extensions on the air hose or on the 
operating handle. 

 

To Lower Vehicle: 

1.

 

Raise  load  high  enough  to  allow  clearance  for  the  jack  stands  to  be  removed,  then  carefully 

remove jack stands. 

2.

 

Insert handle release valve and slowly turn handle counter clockwise, no more then 1/2 a turn.   

3.

 

Grasp the handle firmly with both hands.  Securely hold on to the jack handle so your hands do 

not slip and ensure the load does not rapidly lower. 

4.

 

(Do not allow bystanders around the jack or under the load when lowering the jack). 

 

 

 

 

4.

 

MAINTENANCE 

If you use and maintain your equipment properly, it will give you many years of service.  Follow the 
maintenance instructions carefully to keep your equipment in good working condition.  Never 
perform any maintenance on the equipment while it is under a load. 

 

Inspection:  Inspect the product for damage, wear, broken or missing parts (eg: pins) and that all 

components function before each use.  Follow lubrication and storage instructions for optimum 

product performance.  Ensure all moving parts are clear of dirt and debris.

 

 

 

Cleaning:  If the moving parts of the equipment are obstructed, use cleaning solvent or another 

good degreaser to clean the equipment.  Remove any existing rust, with a penetrating lubricant.

 

 

 

Lubrication:  This equipment will not operate safely without 

proper lubrication.  Using the equipment without proper 

lubrication will result in poor performance and damage to the 

equipment.  A coating of light lubricating oil to pivot points, 

axles and hinges will help to prevent rust.  Periodically check the 

pump piston and ram for signs of rust or corrosion.  Clean as 

needed and wipe with an oily cloth.

 

 

 

 

 

NEVER USE SANDPAPER OR ABRASIVE MATERIAL ON THESE SURFACES. 

 

 

 

 

 

 

 

To Add Jack Oil:  

 

NEVER USE BRAKE FLUID, TURBINE OIL, TRANSMISSION FLUID, MOTOR OIL OR GLYCERIN.  

IMPROPER FLUID WILL CAUSE PREMATURE FAILURE OF THE JACK AND THE POTENTIAL FOR 

SUDDEN OR IMMEDIATE LOSS OF LOAD

 

 

1.

 

With saddle fully lowered and pump piston fully depressed, set jack in its upright level position. 

2.

 

Remove oil filler plug. 

3.

 

Fill until oil is level with the filler plug hole, reinstall oil filler plug. 

 

 

Lubricate

Pivots & Pins

(30/40W Machine Oil)

Add Drops

(10ml SAE32 Grade Oil)

or Air Tool Lubricant

Summary of Contents for BTSJ20TB

Page 1: ...290mm Gross Weight 17kg About the Borum brand Our heavy duty commercial range of Borum Industrial equipment has been manufactured to exacting standards for the past 34 years We specify industrial quality components and design to ensure a long and durable working life in commercial transport mining earthmoving and railway environments Our Borum Industrial range of equipment is focused on achieving ...

Page 2: ...standers or cause damage to the equipment and property Keep this manual in a convenient and safe place for future reference The warnings cautions and instructions discussed in this instruction manual cannot cover all possible conditions and situations that may occur It must be understood by the operator that common sense and caution are factors which cannot be built into this product but must be s...

Page 3: ...he jack is a lifting device only Immediately after lifting support the vehicle with AS Approved jack stands Do not use this jack for any purpose other than specified by this owner s manual Do not modify this jack and do not use this jack for a purpose for which it was not intended POTENTIAL HAZARDS User does not read understand and follow the instructions and warnings in this manual prior to opera...

Page 4: ...e then replace the Oil Filler Bung 2 Start with the Pump Socket Assembly in the horizontal position and turn the Release Valve clockwise to the lifting position 3 With the Jack on its base pull the Pump Socket upwards to the raised position 4 Invert the Jack and push the Pump Socket back to the horizontal position 5 Place the Jack back on its base to test the Pump Socket for firmness 6 Repeat step...

Page 5: ...to the fully lowered position Note Depress the Saddle where necessary At this point the Manual Pump Air Motor Pump and Lift Ram should be free of air and the Jack ready for Operation If the Jack continues to show the Symptoms as above please refer to a Qualified Hydraulic Technician 3 OPERATION Prior to each use always conduct a visual inspection checking for and any abnormal conditions such as cr...

Page 6: ... product for damage wear broken or missing parts eg pins and that all components function before each use Follow lubrication and storage instructions for optimum product performance Ensure all moving parts are clear of dirt and debris Cleaning If the moving parts of the equipment are obstructed use cleaning solvent or another good degreaser to clean the equipment Remove any existing rust with a pe...

Page 7: ...EAR WHEN POURING 4 Replace oil plug 5 Perform air bleeding procedure 5 SERVICE REPAIR Any Bottle Jack found damaged in any way or found to be worn or operates abnormally should be removed from service until repaired by an authorised service agent Owners and or operators should be aware that repair of this product may require specialised equipment and knowledge Only authorised parts labels decals s...

Page 8: ...05 20 BTSJ20TB Made in China to TQB Brands Pty Ltd specifications P a g e 7 Visit us at www tqbbrands com au PARTS DIAGRAM ...

Page 9: ...ew 2 36 Lever 1 9 Nylon Ring 1 37 Nut 1 10 Cylinder 1 38 O Ring 1 11 O Ring 1 39 O Ring 1 12 Cup Seal 1 40 Packing 1 13 Ram 1 41 Throttle 1 14 Packing 1 42 Spring 1 15 Reservoir 1 43 Nut 1 16 Filler Plug 1 44 Air Hose Connector 1 17 Nylon Ring 1 45 Valve Body 1 18 Top Nut 1 46 Screw 1 19 O Ring 1 47 Air Hose 1 20 Spring Plate 1 48 Air Motor 1 21 Spring 2 49 Ball 1 22 Eye Bolt 2 50 Ball Cup 1 23 Nu...

Page 10: ...Bypass through release valve Air cavitation in pump and or lift ram Higher capacity jack required Relief valve needs reset Lubrication flushed out of air motor requires added lubrication Adding lubrication to air motor fails to remedy issue Ensure release valve tightly closed Bleed system Select higher capacity jack Contact qualified technician for repairs Install air water separator to air supply...

Page 11: ...t ram raised for extended period causing air ingress to hydraulic system Fill fluid to correct fluid level and bleed system With ram fully retracted remove oil filler plug to let pressurised air escape reinstall oil filler plug then bleed system Will not lift to full extension Lift ram has limited stroke pump loses resistance Fluid level low Lift ram raised for extended period causing air ingress ...

Page 12: ...ised TQB Brands Pty Ltd repair agent This guarantee applies in lieu of any other guarantee expressed or implied and variations of its terms are not authorised Your TQB Brands Pty Ltd guarantee is not effective unless you can produce upon request a dated receipt or invoice to verify your proof of purchase within the 12month period Consumer Guarantee Our goods come with a guarantee that cannot be ex...

Reviews: