
Install & Operation Manual
Borg & Overström
GB
5
Installation
Major Components
Water & CO2 Connection
Carbonation Switch
Chilled PowerSwitch
IEC Power Socket
CO2 Connector (1/4”)
Inlet Water (1/4”)
Drain Port
Water Tap Set
Right Table Plate
Left Table Plate
Handle
Drip Tray
Control Panel
Leak Detector Reset
Cold Tank
Level Sensor
7
Hot PowerSwitch