B4.2 Install & Operation Manual
Borg & Overström
AU
4
Floor standing Version
1
2
3
All models are designed to fit straight
onto the top of the base cabinet to create
a floorstanding model.
Ensure the feet are in the nesting
positions.
The Door Panel is hinged and fastened
with Magnetic Catches. The cabinet
can be levelled using the adjustable
feet. Service entry is at the back of the
machine.
Every Base Cabinet is supplied with a
Level Sensor Kit, comprising of:
• A water container.
• Sensor unit (c/w 2 no. CR3032
batteries). (Requires some assembly – see
page 7.
• Drip Tray with Drainage Outlet.
• Interconnection kit between unit
and cabinet – see page 25.