Install & Operation Manual
Borg & Overström
GB
5
Operation
cold
hot
heating
Water Connection & Operation
On reservoir models remove the
Carbon bag from the cold tank.
Connect and turn on the water
supply. Then connect the power
supply.
Turn on the cold switch (located
at the rear on the unit) to begin
the chilling process.
Turn on the hot switch (also
located at the rear on the unit) to
activate the heating element.
Flush through 10 litres of water
before use.
Chilled & Ambient:
When the Green LED is on the
cooling circuit is activated.
When the Yellow LED is on the
compressor is operating.
Chilled & Hot:
When the Green LED is on the
cooling circuit is activated.
When the Yellow LED is on
heating circuit is activated.
When the Red LED is on the
heating element is activated.
1
The relevant indicator lights will
be lit.
Dispense from all options (to
confirm water supply).
4
3
cold
hot
heating
cold
chilling
6
5
10
L
cold
chilling
2