PMX40 RF Power Meter – INSTRUCTION MANUAL
2-3
2.4
Preliminary Check
The following preliminary check verifies that the instrument is operational and has the correct software
installed. It should be performed before the instrument is placed into service. To perform the
preliminary check, proceed as follows:
1.
Press the lower half (marked "0") of the power switch in the center of the power module on the
rear panel.
2.
Connect the AC (mains) power cord to a suitable AC power source; 90 to 264 VAC, 47 to 63 Hz.
The power supply will automatically adjust to voltages within this range.
3.
Press the upper half (marked "1") of the power switch in the center of the power module on the
rear panel, it will enter standby mode.
4.
Press the ON/STBY key (marked with the international 0/1 on/standby symbol) on the front
panel to turn the instrument on. The cooling fan and display backlight should turn on.
5.
A bootup screen should appear that shows the boot status. After a self-check, the instrument
will execute the application program. There will be some temporary dialogs indicating application
initialization and channel updating. After several moments, a screen similar to Figure 2-2 should be
displayed.
Figure 2-2. Typical Power-On Display