The initial commissioning of the appliance must be performed by the Technical Services, after which the appliance can
operate automatically.
The system supervisor can turn the appliance on and off as follows:
IGNITION AND SHUTDOWN
INITIAL COMMISSIONING
- Power up the boiler from the electrical mains by setting the main
system switch (IG) to “ON”.
- The display returns to the stand-by screen.
- Press
H
to activate the keypad for the DSP.
date
time
date
OUTSIDE
7
o
C
69
o
0.0
OFF OFF
time
Key
Description offunction
Display
A
RED (at bottom)
Enables return to the selected line without saving/
storing the modified data.
DHW setpoint
50
oK
to confirm
A
A
a
DHW settings
1. DHW setpoint
2. ECO setpoint reduction
3. Scheduler set
oK
to confirm
A
A
a
IG
- 9
-
USE - SYSTEM SUPERVISOR