MOUNTING A DRILL CON’T

4. Drill with chuck and male Cam-Stud.

5. Slip the Ring-Clamp (#711)

over the drill and Drill Mount
Arms (#710).

6. Secure Ring-Clamp in suitable

place on drill. Avoid covering air
vents.

7. If needed, the Drill Mount Arms

(#710) can be extended back by
mounting the arms as shown with
two bolts.

CAM GUARD INSTALLING

1. Kitty-Corner Cam-Guard (#709)

into position between aluminum
supports.

2. Snap right and left sides of the

Cam-Guard on to plastic
tongue as shown.

OPERATION

1. Be sure forward/reverse

switch on the drill is in the
forward position. The
Quikpoint will only deliver mortar when the drill is in for-
ward rotation.

2. Load hopper with mixed mortar.

3. Hold the Quikpoint as in figure A. The oval nozzle can be

rotated for Vertical and Horizontal Joints.

4. For horizontal joints, the Quikpoint should be either

perpendicular to the wall or slightly angled away from the
direction of travel. Fill vertical joints from bottom to top.

5. The Quikpoint will deliver mortar straight down,

horizontally and up to a 55˚ angle above the horizontal.
Use angled nozzle #552-A for overhead applications.

CLEANING AND MAINTENANCE

1. Do not leave mortar in gun for more than one hour.

2. To clean gun, flush with water while gun is

run-

ning. Do not use water hose to clean tool. Use only a
small

con-

tainer to direct water into
the hopper without
spilling. Caution: Keep
water off of drill. Do not
immerse tool in water if
drill is attached.

3. Unplug drill. Remove

nozzle and clean mortar
from inside the nozzle holder and o-ring area of barrel.

4. Dried mortar in Allen set screw sockets can be cleaned

easily with a

1/8

” drill bit.

5. Occasionally apply a small amount of Vaseline or

Petroleum Jelly to the o-ring and nozzle Key groove at front
of barrel.

6. Where the Auger fits into

the Blade-Coupling
(#502) and the
Cam-Coupling (#703) put
Petroleum Jelly into the
holes to keep parts from
corroding.

7. Store tool in dry area.

MORTAR MIXES

The Quikpoint Mortar Gun works well with all standar U.B.C.
(universal building code) mortar mixes up to 2

1/2

fine sand by

volume to one part by volume of theh cements plus lime used.

The strength or P.S.I. of a mix is varied by the type of cement
used and the voluems of cement, lime and fine sand used. For
best results, the aggregate fine (sand) should not have
particales larger than

1/8.

3

2

4430 Gibsonia Rd. • Gibsonia, PA 15044 • USA • www.bontool.com

IS14188 08/09

PAGE 3 OF 4

Summary of Contents for 14-188 Quickpoint

Page 1: ...s steel set screws 1 Extra nozzle key Allen wrench 1 16 oz Scoop no 554 1 8 oz Gibco s MRF Tip blades can be made from 1 8 electrician s snake Bend with pliers and vice to contour below or send for replacement tips A set consists of one long one short blade and on U blade Insert this end in blade coupling Caution Protect eyes when cutting hardened wire NOZZLE ASSEMBLY 1 Drop metal nozzle tip into ...

Page 2: ... on to Barrel 8 Push Nozzle holder on until the Allen Key 506 easily slides into locking hole MOUNTING A DRILL 1 We recommend removing the chuck from the drill and threading the Cam Coupling on to the drill mandrell this makes the whole assembly shorter with much better balance Some drills have a left threaded Reversing Screw holding the chuck onto the drill Open the chuck all the way Then looking...

Page 3: ...le 552 A for overhead applications CLEANING AND MAINTENANCE 1 Do not leave mortar in gun for more than one hour 2 To clean gun flush with water while gun is run ning Do not use water hose to clean tool Use only a small con tainer to direct water into the hopper without spilling Caution Keep water off of drill Do not immerse tool in water if drill is attached 3 Unplug drill Remove nozzle and clean ...

Page 4: ... Auger then the Auger needs to be replaced If the Auger is not warn and there is a similar gap then the Auger Barrel needs to be replaced 2 The Tool Plugs A Check to see that the Nozzle Holder Steel Nozzle and Plastic Retainer are assembled in the correct order the Steel Nozzle is inserted first followed by the Retainer B If the tool plugs remove the Nozzle Holder Holding Nozzle Holder on hard sur...

Reviews: