Protective equip-
ment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
Chapter 6.7 „Parking the machine in
secured condition“ on page 113
.
2.
Allow the engine to cool down.
3.
Loosen the tensioning screw (1) and the
screw (2) on the generator.
4.
Relieve and remove the V-belt.
5.
Assemble a new V-belt at the generator.
6.
Tension the V-belt to the specified value
Chapter 8.8.2 „Checking, tensioning the
.
7.
Retighten clamping screw (1) and screw
(2).
8.9.3
Checking the anti-freeze concentration and the condition
of the coolant
Protective equip-
ment:
n
Protective gloves
n
Safety goggles
1.
Park the machine in secured condition
Chapter 6.7 „Parking the machine in
secured condition“ on page 113
.
2.
Allow the engine to cool down.
3.
Remove the cover (1) from the compensa-
tion tank and check the anti-freeze concen-
tration with a conventional tester.
4.
Check the condition of the coolant.
5.
Thoroughly flush the cooling system if the
coolant is contaminated by corrosion resi-
dues or other suspended matter
8.11.2 „Changing the coolant“ on page 173
.
6.
Close the cover again.
Fig. 131
Fig. 132
Maintenance – Every 500 operating hours
BW 100 AD-5
161
Summary of Contents for BW 100 AD-5
Page 2: ...2 ...
Page 9: ...1 Introduction Introduction BW 100 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 AD 5 19 ...
Page 64: ...Concerning your safety Signage BW 100 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 AD 5 65 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 100 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 100 AD 5 96 ...
Page 97: ...6 Operation Operation BW 100 AD 5 97 ...
Page 122: ...1 Plug Y04 Operation Emergency procedures BW 100 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 100 AD 5 123 ...
Page 134: ...Loading transporting the machine After transport BW 100 AD 5 134 ...
Page 135: ...8 Maintenance Maintenance BW 100 AD 5 135 ...
Page 188: ...Maintenance As required BW 100 AD 5 188 ...
Page 189: ...9 Setting up refitting Setting up refitting BW 100 AD 5 189 ...
Page 197: ...10 Troubleshooting Troubleshooting BW 100 AD 5 197 ...
Page 208: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 AD 5 208 ...
Page 209: ...11 Disposal Disposal BW 100 AD 5 209 ...
Page 211: ......