1.1
Foreword
BOMAG manufactures machines for earth,
asphalt and refuse compaction, stabilizers/
recyclers as well as planers and pavers.
BOMAG’s vast experience in connection
with state-of-the-art production and testing
methods, such as lifetime tests of all impor-
tant components and highest quality
demands guarantee maximum reliability of
your machine.
These operating and maintenance instructions
are part of your machine.
They provide necessary information to operate
your machine safely and properly.
They also contain information on required oper-
ating, maintenance and repair measures.
Carefully read the operating and maintenance
instructions before taking your machine into
operation.
Please observe the safety regulations strictly
and follow all instructions to ensure safe opera-
tion.
If you are not yet acquainted with the controls
and indicating elements on this machine, you
should thoroughly read the corresponding
Chapter 4 „Indicators and control
The description of the individual operating
steps including the notes on safety to be fol-
lowed can be found in chapter “Operation”
Chapter 6 „Operation“ on page 97
Before every start up, carry out all required
visual inspections and function tests
5 „Checks prior to start up“ on page 81
Ensure the compliance with the specified oper-
ating, maintenance and repair measures to
maintain the functional safety of your machine.
Introduction – Foreword
BW 100 AD-5
10
Summary of Contents for BW 100 AD-5
Page 2: ...2 ...
Page 9: ...1 Introduction Introduction BW 100 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 AD 5 19 ...
Page 64: ...Concerning your safety Signage BW 100 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 AD 5 65 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 100 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 100 AD 5 96 ...
Page 97: ...6 Operation Operation BW 100 AD 5 97 ...
Page 122: ...1 Plug Y04 Operation Emergency procedures BW 100 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 100 AD 5 123 ...
Page 134: ...Loading transporting the machine After transport BW 100 AD 5 134 ...
Page 135: ...8 Maintenance Maintenance BW 100 AD 5 135 ...
Page 188: ...Maintenance As required BW 100 AD 5 188 ...
Page 189: ...9 Setting up refitting Setting up refitting BW 100 AD 5 189 ...
Page 197: ...10 Troubleshooting Troubleshooting BW 100 AD 5 197 ...
Page 208: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 AD 5 208 ...
Page 209: ...11 Disposal Disposal BW 100 AD 5 209 ...
Page 211: ......