Bolder Surgical
en - CoolSeal™ Generator
Page | 33
Procedure:
RECORDING RESULTS:
1. You can record the results of the following tests on a copy of the attached log. After each step below, record the result
in the corresponding section as indicated by
<RECORD RESULTS>
. Capture numeric values where indicated and circle
P
for Pass or
F
for Fail.
INSPECTION:
1. Inspect the unit for external damage or missing components, no damage or missing components should be found.
<RECORD RESULTS>
2. Inspect the power cord for damage, no damage should be found.
<RECORD RESULTS>
INDICATOR LIGHTS AND AUDIO INDICATORS:
1. Apply power to the UUT and depress the power button, the power button should illuminate GREEN and a three (3)
tone sequence should be heard. A RED power button illumination indicates a failure of the power on self-test.
<RECORD RESULTS>
2. Insert the Functional Test Cable into the instrument receptacle, the instrument receptacle display should illuminate white.
<RECORD RESULTS>
3. Turn off the power of the UUT. Depress and hold the activate button. Turn on power while holding the activate button
down. The power button will illuminate GREEN and a three (3) tone sequence should be heard, followed by a second tone,
then the instrument receptacle display will flash AMBER.
<RECORD RESULTS>
4. Remove the Functional Test Cable and power the UUT off then on again. The power button should be GREEN. While
depressing and holding the activate button on the Functional Test Cable, insert the Functional Test cable into the
instrument receptacle. A single tone will sound followed by the instrument receptacle display flashing AMBER.
<RECORD RESULTS>
5. Power the UUT off then on again to reset from the previous step. Set the switch on the Functional Test Cable to the
‘Open’ position and depress and hold the activate button. The activation display will momentarily display FUCHSIA
and begin the sealing tone, followed by an AMBER display of approximately 1 second and the 3-tone regrasp alert. This
may sound like 4-tones.
<RECORD RESULTS>
6. Set the switch on the Functional Test Cable to the “Short” position. Depress and hold the activation button and confirm
that the activation display is illuminated FUCHSIA and varying in intensity from off to full intensity with the sealing tone.
This will be followed by an AMBER activation display and a 3-tone alert.
<RECORD RESULTS>
7. With the switch of the Functional Test Cable still in the “Short” position, prepare to time with the stopwatch from pressing
the activation button until the AMBER display. Depress the activate button, timing the FUCHSIA (sealing) phase.
<RECORD RESULTS>
8. With the switch of the Functional Test Cable still in the “Short” position, prepare to twist the volume knob during the
FUCHSIA (sealing phase). Depress the activate button, turn the volume knob to each extreme, confirming a volume
change between Minimum and Maximum levels.
<RECORD RESULTS>
9. Remove the test cable, power off and unplug the UUT.
GROUND CONTINUITY TESTING:
1. Turn on the ESA
2. Plug the power cable from the UUT into the ESA
3. Connect the test lead to the V/Ω/A jack of the ESA to measure Ohms (Ω).
4. Connect the test lead to the ESA ground/null post.
5. Be sure the ESA is measuring resistance (Ω)
6. Zero the ESA.
7. Attach the test lead to the UUT equipotential connector.
8. Record the resistance value seen through the power cable and UUT.
<RECORD RESULTS>
9. Disconnect the UUT from the ESA, power off the ESA.