BOH Enviromental FPU SYSTEMS 99000457-UG Operation Manual Download Page 1

BOH-PM-04-1   

 

 

 

 

 

 

© 2016 BOH Environmental LLC 

Chapter 1 Rev. 2.00 

 

 

FPU

®

 SYSTEMS OPERATION MANUAL 

(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) 

BOH CONTAINERIZED 5 PERSON SHOWER  

BOH FPU Field Pack-up Units 

 

 

 

                                 

 

BOH CONTAINERIZED SHOWER 

BOH FPU

®

 Systems 

BOH ENVIRONMENTAL LLC 

143 Terra Bella Blvd. 

Covington, LA 70433 

POC Doug Cresap (985) 674-0725 

http://www.bohfpusystems.com 

 

 

Summary of Contents for FPU SYSTEMS 99000457-UG

Page 1: ...ATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units BOH CONTAINERIZED SHOWER BOH FPU Systems BOH ENVIRONMENTAL LLC 143 Terra Bella Blvd...

Page 2: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Page 3: ...BOH Containerized Shower When working with ground guides during the loading or unloading of the BOH Containerized Shower onto the selected site do not allow the ground guide between the forks and the...

Page 4: ...t to prevent spillage and slippery surfaces Spills from the shower or sink must be cleaned up immediately Failure to comply could cause injury from a fall WARNING The Shower components can be heavy an...

Page 5: ...EAVY PARTS foot with heavy object on top shows that heavy parts can crush and harm SLICK FLOOR wavy line on floor with legs prone shows that slick floor presents a danger for slipping or falling HEAVY...

Page 6: ...BOH PM 04 1 Chapter 1 Rev 2 00 a This page was intentionally left blank...

Page 7: ...ation 0002 00 Equipment Characteristics Components and Features 0003 00 Equipment Data Labels Identifications Markings 0004 00 CHAPTER 2 OPERATOR INSTRUCTIONS Preparation for Movement 0005 00 Operatio...

Page 8: ...Containerized Shower Repair Parts List 0033 00 Group Numbers 00 Containerized Shower System 01 Containerized Shower 0101 Door Assemblies 0102 Water and Waste caps 02 External Electrical 0201 Internal...

Page 9: ...that detail the topics mentioned above Within each chapter are work packages covering a wide range of topics Each work package is numbered sequentially at page 1 and has its own page numbering scheme...

Page 10: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Page 11: ...Chapter 1 Rev 2 00 FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units CHAPTER 1 INTRODUCTORY INFORMATION WITH THEORY O...

Page 12: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Page 13: ...wer unit is easily loaded and unloaded by forklift rated for 10 000 lb The containerized shower consists of an 8 wide x 20 long x 8 5 high sturdy metal container with a pallet like base It has five in...

Page 14: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Page 15: ...vidual shower compartments with doors with security and privacy locks shower fluorescent lighting sink exhaust fan vanity cabinet with mirror The utility room contains the 80 gal electric hot water sy...

Page 16: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Page 17: ...DUCTORY INFORMATION WITH THEORY OF OPERATION FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units EQUIPMENT CHARACTERISTI...

Page 18: ...2 Shower Top View Layout NOTE The electrical and water connection end is recessed 3 to keep within the container profile Ground rod and strap assembly and city water valve are stored in the utility ro...

Page 19: ...Box 120 240 Volt 1 Phase 40 AMP NEMA 3R 1 Weather Proof Exterior GFCI Receptacle 2 Ground rod and strap are stored in the left corner of the utility room Ground Lug 3 1 Cold Water Inlet 4 4 PVC Black...

Page 20: ...0003 00 BOH PM 04 1 Chapter 1 Rev 2 00 0003 00 4 Grey Water Cleanout NOTE The Grey Water Cleanout 1 is located on the opposite end from the Load Center and water hookups END OF WORK PACKAGE 1...

Page 21: ...RMATION WITH THEORY OF OPERATION FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units EQUIPMENT DATA LABELS IDENTIFICATIO...

Page 22: ...ific corrosion maintenance plan At a minimum equipment should be inspected for corrosion on a quarterly basis monthly if equipment is operated stored in a high salt air environment If corrosion is dis...