BOERPLAY Playchain 203 Manual Download Page 5

B

B

B

Be

ee

en

nn

na

a

a

am

m

m

miiiin

nn

ng

g

g

g

Title

O

O

O

Op

p

p

pm

m

m

me

ee

errrrkkkkiiiin

nn

ng

g

g

g

Comment

D

D

D

Da

a

a

attttu

uu

um

m

m

m

Date

T

TT

Te

ee

ek

kk

ke

ee

en

nn

niiiin

nn

ng

g

g

g

Drawing

TOE PNR 000 203 A

Pionier

Playchain 203

5-10-2010

BOER

S

S

S

SP

P

P

PE

E

E

EE

E

E

ELLLLT

T

T

TO

O

O

OE

E

E

ES

S

S

ST

T

T

TE

E

E

ELLLLLLLLE

E

E

EN

N

N

N

Modules 

Modules

Opmerking

Benaming

Rev.

Bew.

Volgnr

Progr.

Type

#

Nr

Enkel

Wokkel

 

000

325

PNR

MOD

2

1

Speelbuis

Koppelstuk

 

000

530

PNR

MOD

2

2

Speelbuis

Basisstuk

 

000

531

PNR

MOD

1

3

Speelbuis

Bas lippen

 

000

532

PNR

MOD

1

4

buis 70

Einddop

A

000

537

PNR

MOD

2

5

Speelbuis 

Oploopnet

A

000

541

PNR

MOD

1

6

Speelbuis

Spiegel

A

000

549

PNR

MOD

1

7

Speelbuis

Glijstangen

 

000

552

PNR

MOD

1

8

Speelbuis

Loopton

 

000

554

PNR

MOD

1

9

6

3

8

1

9

1

4

7

5

2

G

G

G

Ge

ee

elllle

ee

evvvve

ee

errrrd

d

d

de

ee

e    m

m

m

mo

o

o

od

d

d

du

u

u

ulllle

ee

essss::::

Zie tabel
 
M

M

M

Mo

o

o

on

nn

ntttta

a

a

ag

g

g

ge

ee

eiiiin

nn

nssssttttrrrru

u

u

uccccttttiiiie

ee

e::::

- De hoofdmaten geven de maten van de staanders en vloeren aan
- De detailtekeningen geven specifiek de maten van de verbindingen aan
- De modules met buizen zijn op de tekeningen bemaat op bovenkant kopplaat
- Overige modules zijn bemaat op de bovenkant (klimwanden, paalkappen, etc.)
    
M

M

M

Mo

o

o

on

nn

ntttta

a

a

ag

g

g

ge

ee

evvvvo

o

o

ollllg

g

g

go

o

o

orrrrd

d

d

de

ee

e::::

1 - Graaf de gaten volgens het bodemplan
2 - Verbind 3+4 met 2(2x),9
3 - Plaats 2(2x),3,4,9
4 - Plaats 1(2x),5(2x),6,7,8 en verbind deze aan het toestel
5 - Controleer of het toestel voldoet aan de afmetingen zoals op blad 'afmetingen'
6 - Dicht de gaten en verdicht het zand
 
C

C

C

Co

o

o

on

nn

nttttrrrro

o

o

olllle

ee

essss::::

1 - Correcte opbouw en alle bevestigingsmiddelen
2 - Controleer de afmetingen van de valbodem t.o.v. het toestel
 

S

SS

Su

u

u

up

p

p

pp

p

p

plllliiiie

ee

ed

d

d

d    m

m

m

mo

o

o

od

d

d

du

u

u

ulllle

ee

essss::::

See table
    
A

A

A

Asssssssse

ee

em

m

m

mb

b

b

bllllyyyy    iiiin

nn

nssssttttrrrru

u

u

uccccttttiiiio

o

o

on

nn

n::::

- The main dimensions indicate the dimensions of the posts and floors
- The detailed dimensions show the specific dimensions of the connections
- The modules which contain tubes are dimensioned at the top of the flanges
- Other modules are dimensioned at the top (climbing walls, caps for the posts, etc.)
  
IIIIn

nn

nsssstttta

a

a

alllllllla

a

a

attttiiiio

o

o

on

nn

n    sssse

ee

eq

q

q

qu

u

u

ue

ee

en

nn

ncccce

ee

e::::

1 - Dig the holes according to the ground plan
2 - Assemble tower 3+4 using 2(2x),9
3 - Place tower 2(2x),3,4,9
4 - Place 1(2x),5(2x),6,7,8 and attach it to the unit
5 - Check that the unit conforms to the dimensions on sheet 'dimensions'
6 - Close the holes and compacted the sand
 
 C

C

C

Ch

hh

he

ee

ecccckkkkssss::::

1 - Correct assembly and all the fasteners
2 - Check the dimensions of the safety area with regard to the play equipment
 

Summary of Contents for Playchain 203

Page 1: ...PNRE000 203 Playchain 203 ...

Page 2: ...T T Te e e ek k k ke e e en n n ni ii in n n ng g g g Drawing TOE PNR 000 203 A Pionier Playchain 203 5 10 2010 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Afmetingen Dimensions 0 00 m 0 24 m 0 94 m 1 37 m 0 00 m 0 73 m 0 87 m 0 98 m 1 73 m 2 32 m 2 97 m 3 34 m 4 34 m 4 63 m 0 00 m 0 34 m 0 71 m 1 08 m 1 23 m ...

Page 3: ...u um m m m Date T T T Te e e ek k k ke e e en n n ni ii in n n ng g g g Drawing TOE PNR 000 203 A Pionier Playchain 203 5 10 2010 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Obstakelvrije zone Obstacle free zone Obstakelvrije zone Obstacle free zone Opvangzone Impact area 4 28 m 7 62 m 5 05 m ...

Page 4: ...t tu u u um m m m Date T T T Te e e ek k k ke e e en n n ni ii in n n ng g g g Drawing TOE PNR 000 203 A Pionier Playchain 203 5 10 2010 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Bodemplan Groundplan 0 60 m 1 23 m 0 84 m 0 70 m 1 52 m 1 62 m 1 76 m 0 86 m 1 76 m 1 62 m 0 55 m 2 01 m ...

Page 5: ... g ge e e ev v v vo o o ol ll lg g g go o o or r r rd d d de e e e 1 Graaf de gaten volgens het bodemplan 2 Verbind 3 4 met 2 2x 9 3 Plaats 2 2x 3 4 9 4 Plaats 1 2x 5 2x 6 7 8 en verbind deze aan het toestel 5 Controleer of het toestel voldoet aan de afmetingen zoals op blad afmetingen 6 Dicht de gaten en verdicht het zand C C C Co o o on n n nt t t tr r r ro o o ol ll le e e es s s s 1 Correcte o...

Page 6: ...inspection authority Liftinstituut B V Buikslotermeerplein 381 A dam 1025 XE Amsterdam Name manufacturer BOERplay Hyacintstraat 2 4255 HX Nieuwendijk Phone 31 0 183 40 23 66 Fax 31 0 183 40 35 64 name installer Description of equipment Playchain 203 Location of equipment Data about the owner of the play equipment Name Address Postcode and town Contact person Telephone number Data about the adminis...

Page 7: ...opes cables chains and nets for wear and damage Steel cables and nets which are tensioned must be checked for tension Replace parts where necessary Steel cables and nets must be tensioned 3 9 Inspect equipment for unsafe changes and additions Remove unsafe additions and correct unsafe changes 1 10 Inspect safety surfaces Restore and repair where necessary 1 Remarks 1 If used intensively all points...

Page 8: ......

Page 9: ... g Title O O O Op p p pm m m me e e er r r rk k k ki ii in n n ng g g g Comment D D D Da a a at t t tu u u um m m m Date T T T Te e e ek k k ke e e en n n ni ii in n n ng g g g Drawing MOD PNR 325 000 Wokkel Enkel 9 1 2009 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Samenstelling module Assembly module 1 2 ...

Page 10: ... Drawing MOD PNR 530 000 Koppelstuk Speelbuis 20 8 2010 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Samenstelling module Assembly module Buis 60 15x30 Zadelring A 030 015 T60 KST 2 4 Speelbuis Koppeling A POM 032 PNR KST 1 3 M10 SLUITRING 002 010 030 BSR 2 2 ISO 7380 M10 x 30 BOLKOP SCHROEF 030 010 023 BSR 2 1 OPMERKING BENAMING R ...

Page 11: ...u um m m m Date T T T Te e e ek k k ke e e en n n ni ii in n n ng g g g Drawing MOD PNR 531 000 Basisstuk Speelbuis 22 9 2011 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Samenstelling module Assembly module Speelbuis basisstuk A 320 351 PNR SME 1 1 OPMERKING BENAMING R BEH NR PROJ TYPE N POS ...

Page 12: ...m m Date T T T Te e e ek k k ke e e en n n ni ii in n n ng g g g Drawing MOD PNR 532 000 Basisstuk lippen Speelbuis 22 9 2011 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Samenstelling module Assembly module Speelbuis Basisstuk lippen A 320 352 PNR SME 1 1 OPMERKING BENAMING R BEH NR PROJ TYPE N POS ...

Page 13: ... k ke e e en n n ni ii in n n ng g g g Drawing MOD PNR 537 000 A Einddop buis 70 11 12 2013 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Samenstelling module Assembly module OPMERKING BENAMING R BEH NR PROJ TYPE N POS buis 70 x 2 4 5 Lamellenstop 005 070 LAM KST 1 1 4 8 x 12 RVS A2 70 Klinknagel bolkop 050 005 014 BSR 3 2 1 2 ...

Page 14: ... SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Samenstelling module Assembly module Opmerking Benaming Rev Bew Volgnr Progr Type Nr M6 VZ 8 8 Zeskantmoer 005 006 017 BSV 3 1 M6 x 50 VZ 8 8 Zeskantbout ISO 4014 050 006 021 BSV 3 2 M6 VZ 8 8 Sluitring 002 006 030 BSV 6 3 750x100x19 Ankerplaat 075 APL KST 1 4 tbv EI 05 Insteek Draadbus 304 394 PNR...

Page 15: ...g Rev Bew Volgnr Progr Type Nr M10 RVS A2 70 Borgdopmoer 020 010 011 BSR 5 1 M10 x 55 RVS A2 70 Bolkopbout ISO 7380 055 010 023 BSR 5 2 6 MM ROOD OPVULDOPJE 030 006 DOP KST 5 3 M10 x 2 5 MM RING NYLON 000 010 ROR KST 10 4 Speelbuis Spiegelplaat voor PE rand 320 422 PNR OME 1 5 Speelbuis Achterkant schoolbord 035 PNR OPE 1 6 Speelbuis Rand schoolbord 036 PNR OPE 1 7 1 4 7 5 6 3 2 4 ...

Page 16: ... k k ke e e en n n ni ii in n n ng g g g Drawing MOD PNR 552 000 Glijstangen Speelbuis 28 11 2011 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Samenstelling module Assembly module Opmerking Benaming Rev Bew Volgnr Progr Type Nr EI 05 Submodule 000 005 PNR SMD 2 1 Speelbuis Glijstangen B 320 361 PNR SME 1 2 2 1 0 88 m 0 60 m ...

Page 17: ... ng g g g Drawing MOD PNR 554 000 Loopton Speelbuis 20 8 2010 BOER S S S SP P P PE E E EE E E EL L L LT T T TO O O OE E E ES S S ST T T TE E E EL L L LL L L LE E E EN N N N Samenstelling module Assembly module Playchain Draaiton 000 033 PNR SMD 1 4 Speelbuis draaitonbuis 320 378 PNR OME 1 3 Speelbuis Borgring A POM 031 PNR KST 2 2 5 x 30 SPIRAALBUS 030 005 047 BSR 4 1 OPMERKING BENAMING R BEH NR P...

Reviews: