background image

1

INSTALL  WEIGHT  STACK  SHROUDS

ASSEMBLY IS COMPLETE!  Tighten all bolts, starting with main frame bolts 

on the base, and work way to top.

1. Attach Weight Stack Shroud (201) and Weight Stack Shroud with Number (202) 

to the tabs welded on Base Frame (1) and Top Frame (2) as shown, using four 

5/16" X 1/2" Round Bolts (89) and four 5/16" Washers (102).

(201)

(202)

102

89

102

89

89

102

89

201

102

202

2

1

(89)

(102)

Summary of Contents for LGLSD

Page 1: ...me bolts on the base and work way to top 1 Attach Weight Stack Shroud 201 and Weight Stack Shroud with Number 202 to the tabs welded on Base Frame 1 and Top Frame 2 as shown using four 5 16 X 1 2 Roun...

Page 2: ...Y ACRYLIC PANEL RIGHT ACRYLIC PANEL LEFT ACRYLIC PANEL CONNECTOR PLATE PLASTIC STUDS M6 X 70L ROUND SCREW M6 X 12L MALE SCREW M5 X 16L TAPPING SCREW SEALING RING 308 307 303 308 1 Attach Right Acrylic...

Page 3: ...N QTY CABLE ARM ASSEMBLY CABLE ARM CONNECTOR CABLE ARM SWIVEL CABLE ARM END ADJ FLOATING PULLEY BLOCK STABILIZING PLATE CABLE GUIDE PLATE PULLEY GUIDE BRACKET CABLE ARM COLLAR STEEL SPACER AXLE COLLAR...

Page 4: ...04 2 Attach CABLE ARM ASSEMBLY 401 and STABILIZING PLATE 17 to BASE FRAME 1 using two 3 8 X 3 1 4 HEX BOLTS 81 four 3 8 WASHERS 100 and two 3 8 NYLON NUTS 104 You may need to loosen the bolts at the t...

Page 5: ...X 1 3 4 HEX BOLT 101 and one 3 8 Nylon Nut 124 3 Then route the cable under Pulley A3 mounted in a DOUBLE PULLEY BLOCK 436 using one 3 8 X 1 3 4 HEX BOLT 426 and one 3 8 NYLON NUT 434 4 Continue rout...

Page 6: ...te the cable up and over Pulley C2 mounted to the bottom of the DOUBLE PULLEY BLOCK 436 using one 3 8 X 1 3 4 HEX BOLT 426 and one 3 8 NYLON NUT 434 2 Screw the threaded end of the cable half way into...

Page 7: ...the cable over top of these pulleys Tighten these nuts making sure the PULLEY GUIDE BRACKETS 408 do not rub against the cable 2 Continue routing on both sides down and around Pulleys P4 and P6 mounte...

Reviews: