
14
The Jones
Step 2:
Assembly of the Guide Rods, Rack Holders and Top Frames
1. Loosen the two 5/16” x 1/4” set screws (49) on the left base bearing housing (15L).
2. Insert one guide rod (12) into the round receptor of the left base bearing housing (15L).
3. Slide one safety spotter (22), one 1” spring (32), one 1” ID big washer (29) and one vertical
bearing housing (20) over the guide rod (12). Make sure the handle of the safety spotter (22) is
facing the inside of the machine (fig. A & B).
4. Insert one rack holder (11) into the square receptor of the left base bearing housing (15L) and
secure with two 3/8”x2-3/4” hex bolts (44), four 3/8” washers (51) and two 3/8” nylon nuts (55).
5. Attach the left bar rack (9L) to the inside of the rack holder (11) with six 3/8”x2-3/4” hex bolts
(44), twelve 3/8” washers (51) and six 3/8” nylon nuts (55).
6. Loosen the two 5/16”x1/4” set screws (49) on the left top bearing housing (17L).
7. Place one top frame (2L) over the guide rod (12), upright frames (3) and the rack holder (11).
8. Attach the top frame (2L) to the left top bearing housing (17L) with two 1/2”x3-1/4” hex bolts
(40), four 1/2” washers (50) and two 1/2” nylon nuts (54).
9. Repeat the steps 1 to 8 on the right side with the respective right side parts (16R, 10R, 18R, 2R).
Summary of Contents for 3D Smith Rack The Jones
Page 2: ...2 The Jones ...
Page 4: ...4 The Jones ...
Page 13: ...13 ...
Page 15: ...1R 1L 2R 2L 15 ...
Page 25: ...25 7 3 Exploded Drawing ...
Page 30: ...30 The Jones Notes ...
Page 31: ...31 ...
Page 32: ...3D Smith Rack The Jones ...