
4
Be careful to assemble all components in the
sequence they are presented.
NOTE:
Finger tighten all hardware in this step. Do Not wrench tighten until the end of step 6.
Inch
MM
12
A.
Remove both Cables from plastic bag, and locate the longer Cable.
The longer of the two Cables is over 30 feet long, this is Cable number 9.
Uncoil Cable (9). Straightening out the Cable first will stop the cable from
twisting up, after it has been installed.
B.
Insert Cable (9) into Double Pulley Pivot (E) as shown.
C.
Route Cable between pulleys, and up over the Wide Pulley (6).
Route Cable over Plastic Pulley (5) as shown. These two Pulleys are
located on the front side of Top Frame (J).
D.
Route Cable through Double Pulley Holder (M), and hold in place by
installing Small Pulley (4) using:
*
One 15 (3/8” x 2 1/2” hex head bolt)
Two 21 (3/8” washer)
One 31 (3/8” nylon lock nut)
*NOTE:
Leave Bolt 15 hand tight, you will be routing the Cable around the second
Small Pulley (4), in Step 5.
S T E P
Summary of Contents for GCCA
Page 1: ...GCCA fits onto G2B G3S G5S G6B G10B ASSEMBLY INSTRUCTIONS ...
Page 3: ......
Page 6: ......
Page 7: ......
Page 11: ......
Page 15: ...15 small pulley wide pulley Reverse Side Drawing S T E P 5 front side back side Angled Pulley ...
Page 17: ...S T E P 6 17 free floating pulley on your gym ...
Page 19: ......
Page 20: ......