
Be careful to assemble all components
in the sequence they are presented.
mm
Inch
3
6
S T E P
A.
Attach two Top Panels (G) to Rear Arch Post (F) and install Pulley (17) using:
Two 46 (3/8” x 4 1/4” hex head bolt)
One 7 (5/8” x 3” spacer)
Two 5 (5/8” x 1” spacer sleeve)
Four 74 (3/8” washer)
Two 72 (3/8” nylon lock nut)
B.
Attach End Cap (3) to the top of Panel Spacer (H) as shown.
Attach Panel Spacer (H) between the two Top Panels (G) using:
Two 48 (3/8” x 3 3/4” hex head bolt)
Four 74 (3/8” washer)
Two 72 (3/8” nylon lock nut)
C.
Attach Vertical Frame (J) to Front Base Frame (C) and Flat Plate (115) using:
One 42 (1/2” x 3” hex head bolt)
One 41 (1/2” x 3 1/4” hex head bolt)
Three 73 (1/2” washer)
One 71 (1/2” nylon lock nut)
D.
Attach Vertical Frame (J) between Top Panels (G) using:
Two 48 (3/8” x 3 3/4” hex head bolt)
Four 74 (3/8” washer)
Two 72 (3/8” nylon lock nut)
Attach two End Caps (2) to Vertical Frame (J) as shown.
NOTE:
At this point you must make sure that the gym is level, stable and in the right location.
You should now wrench tighten all bolts and nuts on the mainframe unit only.
Also, leave all pulley bolts finger-tight until after STEP 14.
E.
Attach Water Bottle Bracket (116) to the left Rear Arch Post (F) into the appropriate holes
using:
Two 118 (1/8” x 3/8” screw)
Two 119 (1/8” washer)
F.
Slide the Water Bottle holder (117) onto the Water Bottle Bracket (116).
Water Bottle (120) will fit into Water Bottle Holder (117).
Summary of Contents for G4I
Page 1: ...by Body Solid A s s e m b l y I n s t r u c t i o n s ...
Page 5: ...2 5 S T E P RED DOT YELLOW DOT ...
Page 7: ...3 7 S T E P ...
Page 9: ...4 9 S T E P marked with L and a RED dot marked with R and a YELLOW dot ...
Page 11: ...5 11 S T E P ...
Page 13: ...6 13 S T E P ...
Page 15: ...15 REVERSE SIDE DRAWING 7 S T E P ...
Page 17: ...8 17 S T E P ...
Page 36: ...E X P L O D E D V I E W D I A G R A M G 4 I 36 ...