18
L
M
6
4
Step 7
After the mortar (M) has hardened,
connect the sockets and mount the device
carrier in the housing � Then cut the
recesses for the flexible cables (L) and for
the cable glands in the stones so that
they can be laid flat on the floor socket
without damaging the cables (see figure
below and opposite view on the right)�
Summary of Contents for 76 A-Series
Page 1: ...Bedienungsanleitung Instruction Manual 76er A Serie 76 A Series...
Page 11: ...11 Ansicht von der Gegenseite...
Page 12: ...12 Schritt 8 Mit dem Pflastern fortfahren Die Boden steckdose ist nun erfolgreich eingebaut...
Page 19: ...19 View from the opposite side...
Page 20: ...20 Step 8 Continue paving The floor socket is now successfully installed...