8
Assembly Recommendations:
Use a large, flat, clean work surface for assembling your REVOLUTION.
All Screws (unless noted) should be installed snug, then rotated 1-2 ½
turns.
Apply LOCTITE 242
™
to all M4 Machine Screws that are used to secure
plywood pieces except for the 4 screws that clamp the router in the final
assembly.
Light sanding may be required to remove any marks made by the laser.
Painting or applying stain with a clear coat will provide extra protection to
the wood components.
You may wish to using strips of 1-inch blue
painters’
tape behind the T-
Slots to help hold the Nuts in place during assembly. A telescoping
magnetic pickup tool can also be a handy way of placing and holding small
Nuts during assembly.
Lock Nuts are never used to secure components that have T-Slots. They
are only used to mount components where the Nut is not held in a
T-Slot.
CAUTION
This kit contains numerous small
components that pose a choking risk for small
children and pets. Keep kit pieces in a secure
location out of the reach or small children and pets.
Summary of Contents for REVOLUTION
Page 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Page 21: ...20 1 2 3 4 ...
Page 23: ...22 The finished Z Assembly should look like this ...
Page 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Page 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Page 96: ...95 Completed Left Side ...
Page 100: ...99 Completed Right Side ...
Page 143: ...142 Completed Views Front View Back View ...
Page 144: ...143 Left Side Right Side ...
Page 145: ...144 Properly Wired Controller ...