Page 89
Tighten all screws and wipe off the surface of the Base Board
Assembly to remove any dust or debris to prepare for gluing
the T
-
slot boards.
Step 2
When gluing and setting the T
-
Slot Boards in place make
sure the routed slots are facing down
Step 3
Be sure to test fit the
boards before securing
with screws.
Summary of Contents for E4
Page 1: ...Page 1 Version 1 00 Assembly Manual E4 ...
Page 21: ...Page 21 Step 5 Attach Y Carriage Bottom Support and secure with five M4 x 16 Screws and Nuts ...
Page 22: ...Page 22 Step 6 Attach Z Rail Stop and secure with two M4 x 16 Screws and Nuts ...
Page 29: ...Page 29 2 3 4 ...
Page 32: ...Page 32 Slide 8 x 22 x 7 Bearing on Threaded Rod Thread 5 16 Nut on top of the Bearing ...
Page 38: ...Page 38 Secure Stepper Motor Mount with four M4 x 16 Screws and Nuts ...
Page 43: ...Page 43 Attach four X Large Corner Supports Secure each with 2 M4 x 16 Screws and Nuts Step 4 ...
Page 55: ...Page 55 Left Side Right Side ...
Page 63: ...Page 63 ...
Page 72: ...Page 72 Spiral wrap the Home Switch Wires and zip tie the wrapped wires as shown Step 6 ...
Page 74: ...Page 74 These photos illustrate how the belt wraps around the GT2 Pulley and Idler ...
Page 92: ...Page 92 Clamping System ...