![Bobrick SureFlo B-8281 Instructions For Installation, Operation, Maintenance Download Page 2](http://html.mh-extra.com/html/bobrick/sureflo-b-8281/sureflo-b-8281_instructions-for-installation-operation-maintenance_2781843002.webp)
1. Place Counter Gasket over
mounting hole to align with
profile of dispenser.
2. Remove the rubber band
and Fiber Optic Nut from
the Fiber Optic Cables.
NOTE:
Keep the Fiber Optic
Nut for use later. The rubber
band will not be reused.
3. Insert the stem with the
clear plastic tube and Fiber
Optic Cables through the
mounting hole. Make sure
the fiber optic cables and
tube are placed inside the
grooves on the stem.
4. Place the Wave Washer on
top of the Mounting Nut.
Install Mounting Nut on
Stem and thread upwards.
(Minimum 2-1/4" (55mm)
diameter clearance needed
below mounting nut).
NOTE:
The outer diameter of
the Mounting Nut may need to
be filed down if space under
the counter is tight.
NOTE:
Make sure Fiber
Optic Cables and Tubing are
INSIDE
Mounting Nut. Do not
tighten completely until end of
installation.
Installation:
Filling Instructions:
(use foam soap only)
Unit will dispense commercially Marketed Bulk Foam Soap.
1. Insert tip of BobKey provided into opening of concealed locking mechanism to disengage door.
2. Door will disengage and rotate clockwise for filling from the top.
3. Fill dispenser with commercially marketed bulk foam hand soap
(Do not use liquid or lotion soap).
4. Close door counter-clockwise to lock in place.
Replacement Parts List
Part Name
Part No.
- A/C Adapter
3974-57
- A/C Adapter with International Assortment Plug Kit (U. K., Europe, Australia)
3974-55
- Mack Gasket Kit
824-167
(To secure Top Assembly under the counter due to irregular counter surface)
- External A/C Multi Adapter Kit
824-201
- Nozzle Tip Replacement Kit Foam
828-310
- D Size Battery Pack
(Batteries not included)
824-241
- Foam Mixer Housing
828-322
- Installation Hardware Packet with Foam Mixer Housing
8281-43
(Includes Wave Washer, Counter Gasket, Mounting Nut, BobKey, Stem Locking Nut)
- Fiber Optic Nut
828-83
- Top Housing Assembly Foam
8281-25
(Includes Installation Hardware Packet and Foam Mixer Housing)
- Bottom Housing Assembly Foam
8281-50
TOP FILL ONLY !
Apply a bead of Silicone
around the base of the Top
Housing above the counter
to prevent spilled soap
from going through the
mounting hole.
5. Thread the Stem Locking
Nut onto the Stem. The
ribs on the Nut are to
be towards the top.
Once it goes past the
two red o-rings, the nut
will automatically stop
threading.
NOTE:
Make sure the fiber
optic cables and the plastic
tubing are
OUTSIDE
of the
stem locking nut.
6. Attach the tubing to the top
barb of the Foam Mixer
Housing.
7. The Bottle Cap can only
be placed onto the Stem
in one orientation. The
flat section on the Stem is
to be aligned with the flat
section on the Bottle Cap.
8. Rotate the Bottle back and
forth to align the flat section
of the Stem to the flat
section on the Bottle.
9. Push the Bottle Assembly
up onto the Stem while
also inserting the Foam
Mixer Housing into the hole
in the post on the Bottle
Cap.
Fully insert the Bottle
Assembly over the Stem
until it stops. Both red
o-rings must be inside the
Bottle Cap.
10. While pushing upwards on
the Bottle, Thread the Stem
Locking Nut down onto the
Bottle Cap threads
NOTE:
After assembly, hold
the Stem and lightly rotate the
Bottle back and forth and tug
down to be sure it is on tight. If
it is loose, repeat Steps 7 and
8.
NOTE:
Tug Tubing on Foam
Mixer Housing down from
under the counter to straighten
out the tubing.
11. Connect the small diameter
tube from the Foam Mixer
Housing to the air tube
adapter barb located on the
Bottom Housing.
12. Slide the Fiber Optic
Nut over the Fiber Optic
Cables.
13. Insert the Fiber Optic
Connector Tip Assembly
into the bottom housing.
Keyed feature on the
Connector Tip ensures
Fiber Optic Cables are
always located properly.
Thread the Fiber Optic Nut
onto the Connector Port
and hand snug tighten.
NOTE:
DO NOT bend or kink
Fiber Optic Cables.
14. Align the Top Assembly
above the counter to the
desired position and tighten
the Mounting Nut against
the bottom of counter so
the Top Assembly does not
easily rotate. Make sure
Fiber Optic Cables are not
between the underside
of the counter and top of
Mounting Nut. See Steps 4
and 5.
15. Mount Battery Pack on
wall nearest dispenser.
Mounting hardware is
inside the Battery Pack.
*Round Cap on plug is not
required for this model, pull
back prior to plugging into
port.
16. Install 4 “D” cell Alkaline
batteries.
17. Plug Power Supply into
Bottom Housing base.
3
2