
*NOT FOR LIFTING/LOWERING HUMANS
Page 2 09/07/2017
Step 1
- Installing PILING-MOUNT bracket
1.) Place PILING-MOUNT bracket onto your piling,
ensuring the top is 42” above the dock’s
surface. Now, using heavy nails hang bracket
into place using staggered bolt holes. Be sure
bracket is 100% PLUMB!
Remember: Up-N-Over™ rotates 180°, so be
sure to choose the correct orientation for this!
Refer to photo on cover of this manual.
2.) Drill (6) holes using your PILING-
MOUNT bracket as your template.
These will be drilled in a cross-pattern.
Remember: ¾” diameter bolts only!
3.) Now install the (6) mounting bolts, and
tighten down onto 3” x 3” square washers.
Note: Stainless hardware recommended.