
F12�Chassis�Dynamics
5.�Steering
47
F12�24�V�operation�of�EPS
Index
Explanation
1
Battery�power�distribution�box
2
Battery
3
Intelligent�battery�sensor�IBS
4
Auxiliary�battery
5
Separator
6
Charging�controller�for�auxiliary�battery�(Battery�Charge�Unit�[BCU])
7
Luggage�compartment�power�distribution�box
Terminal�30
Terminal�30
Terminal�30F
Terminal�30,�fault-dependent
LIN-Bus
Local�interconnect�network�bus
The�relay�in�the�separator�connects�the�battery�and�auxiliary�battery�in�series�in�order�to�operate�the
EPS�with�24�V.
Summary of Contents for F12 2011
Page 1: ...Technical training Product information BMW Service F12 Chassis Dynamics...
Page 61: ...F12 Chassis Dynamics 6 Driving stability control 57 F12 Dynamic Drive system wiring diagram...
Page 63: ...F12 Chassis Dynamics 6 Driving stability control 59 F12 EDC system wiring diagram...
Page 67: ......