
Frozen relays (device perma-
nently faulty)
Temperature sensor faulty
Fault current test negative
Check the maximum permitted
continuous charge rate of the
wall outlet.
Connect the charging cable
2
to the charging socket
1
on
the E-Scooter. Plug in the
charging cable connector and
press until the locking mecha-
nism
3
is engaged.
Observe the charging cable
displays.
The standard charging cable
will automatically carry out all
of the required test steps. If
LED
2
turns green, the test
was successful and charging
will begin. If LED
4
turns red,
the test was not successful
and the charging procedure
cannot begin. The following
test steps will be carried out:
A check will be carried out
to see if there is a protective
ground connection
A check will be carried out to
ensure that the prerequisites
for proper charging are in place
The status displays / fault mes-
sages are listed in the chapter
"Technical Data".
Symbol
1
for the active charg-
ing procedure and the remaining
charging time
2
are displayed.
6
62
z
BMW ePOWER
Summary of Contents for Cevolution
Page 1: ...Rider s Manual US Model Cevolution BMW Motorrad...
Page 6: ......
Page 12: ...2 10 z Overviews...
Page 14: ...2 12 z Overviews...
Page 16: ...Underneath seat 1 Tool kit 84 2 Load capacity table 3 Tire pressure table 2 14 z Overviews...
Page 20: ...2 18 z Overviews...
Page 38: ...3 36 z Displays...
Page 53: ...Setting Mirrors 52 Headlight 52 Brakes 52 Spring preload 52 5 51 z Setting...
Page 56: ...5 54 z Setting...
Page 68: ...6 66 z BMW ePOWER...
Page 102: ...9 100 z Maintenance...
Page 103: ...Accessories General notes 102 Onboard power outlets 102 Topcase 103 10 101 z Accessories...
Page 108: ...10 106 z Accessories...
Page 128: ...13 126 z Service...
Page 145: ...Work performed at km Date 13 143 z Service...
Page 146: ...13 144 z Service...
Page 154: ...15 152 z Index...