![BMS SR220 Operation Manual Download Page 28](http://html.mh-extra.com/html/bms/sr220/sr220_operation-manual_2779905028.webp)
27
9.2.13 Rmax
Same as 9.2.4 Rt.
9.2.14 Peak count Rpc
The value C in the figure is the distance between the two lines symmetry based on the center line and parallel with
the center line. There are two types of C value: one is the absolute value of the actual distance; the other is the
relative percentage. Determine the C value required for assessment first. Then calculate RPc peak counts. A peak
higher than C value and an adjacent valley lower than C value form a number of RPc peak count. RPc is
calculated and assessed based on the evaluation length using the following formula:
cm
Peaknumber
cm
RPc
/
)
(
length
Evaluation
count
Peak
9.2.15 Profile support rate curve Rmr
Curve of profile support rate v.s. horizontal positions
.
9.2.16 Profile support length rate Rmr(c)
Ratio of length of the material at a given level position C of profile and the evaluated length.
length
Evaluated
)
(
length
Support
)
(
c
c
Rmr