BMG Labtech spectrostar nano Operating Manual Download Page 16

SPECTROstar Nano Operating Manual 

 

BMG LABTECH 

16/16 

0601B0001C 

2012-07-18 

  Software Installation  

4.2

The Control and MARS Data Analysis software must be installed first on the PC/laptop before connecting the 
SPECTROstar Nano. 
 
Insert the supplied CD-ROM for the SPECTROstar Nano and follow the instructions for both installing the 
Reader Control and MARS Data Analysis software. 
 

 

  Power and Communication Connections  

4.3

Connect the supplied 24 V / 5 A power supply to the SPECTROstar first before connecting the other end to 
the mains power outlet. 
 
Connect the supplied USB cable to the USB connector located at the backside of the SPECTROstar Nano.  
 
Connect the other end of the USB cable to a standard USB port of a PC/laptop.  
 
Switch on the SPECTROstar Nano by briefly pushing the “Power On”  button and power up the PC/laptop. 
The Power LED shows a steady green light, indicating that the SPECTROstar Nano is now turned On and in 
standby.  
 
Double click the SPECTROstar Nano icon. A window will appear and upon clicking “Run” for the standard 
“user” the Control Software will automatically recognize the SPECTROstar Nano and will establish a 
connection. 
 
You can verify the connection by going into the “Settings” menu and perform a “Connection” manually. 
 
Once the SPECTROstar Nano has been connected, it is not necessary anymore to power on the instrument 
before starting the Control Software. The reader will be switched On by simply starting the Control Software. 
 

 

General Warnings for Operation 

 

 
 

Do not obstruct the heat sink with any objects and avoid placing thermal sources (e.g. 
external power supply) near the heat sink  

 

 
 

Connect only the supplied DC power supply to the SPECTROstar Nano.  Keep the DC 
power supply at a dry, cool, and protected location 

 

 
 
 

Never open the plate carrier door while measuring

 

 
 

Summary of Contents for spectrostar nano

Page 1: ...SPECTROstar Nano Operating Manual Revision C...

Page 2: ...formats By using proprietary technology in a variety of important parts the SPECTROstar Nano delivers high end results SPECTROstar Nano Manufacturer BMG LABTECH GmbH Allmendgr n 8 77799 Ortenberg Ger...

Page 3: ...ation is subject to change without notice BMG LABTECH GmbH shall not be liable to any extent whatsoever for any damages resulting from or arising out of the use or performance of this system and relat...

Page 4: ...6 CLEANING AND INSTRUMENT DISINFECTION 9 2 7 DISPOSAL AND INSTRUMENT TAKEBACK RECYCLING PROGRAM 11 2 7 1 DISPOSAL OF TRANSPORT PACKING 11 2 7 2 WEEE COMPLIANCE 11 3 OVERVIEW 12 3 1 FRONT AND KEYPAD C...

Page 5: ...m height 8 5 mm Light Source High energy xenon flash lamp Detector Spectrometer with CCD Spectral Range 220 1000 nm for ABS Absorbance Spectrometer Sensitivity ABS with Spectrometer Selectable Spectra...

Page 6: ...conformity Over voltage category II Contamination class II Protection class III Dimensions Width 36 cm depth 50 cm height 16 cm Weight 11 kg Options Gas Vent system to inject an atmosphere or to pull...

Page 7: ...an lead to unsafe operation of this equipment The area designated for the instrument should be free of dust liquids and acidic vapour The surface of the table should be flat and even Avoid areas subje...

Page 8: ...jure the eye Thus avoid looking at the light directly During normal operation the user will not encounter any light from the xenon flash lamp Chemical and Biological Safety 2 5 Daily routine with this...

Page 9: ...authorities Use suitable disinfectants e g Alcohol 70 Authorized personnel wearing disposable gloves and protective clothing should only perform the disinfection procedure The location should be well...

Page 10: ...the instrument and its inventory have been disinfected according to the instructions given in the Operating Manual Name ________________________________________________ Firm __________________________...

Page 11: ...involved in the life cycle of electrical and electronic equipment The directive specifies that as of August 13 2005 manufacturers of specified electronic equipment will be obliged to take back these p...

Page 12: ...TECH s LVis Plate for low volume measurements down to 2 L and for instrument performance testing 3 1 2 Cuvette Port The SPECTROstar Nano comes with an integrated cuvette port for standard cuvettes wit...

Page 13: ...red reader error has occurred MICROPLATE In Out Reader is in standby Short click microplate carrier will move In Out Long click 3 sec microplate carrier will move to transport lock position MICROPLATE...

Page 14: ...ument Control and MARS Data Analysis software CD ROM in a cover inside the manual Manual also on CD ROM Power cord External Power Supply USB cable Slotted 5 5 mm screwdriver Call BMG LABTECH immediate...

Page 15: ...p of the instrument Locate the silver screw located next to the label Transport Lock figure 5 Use the supplied 5 5 mm slotted screwdriver and unlock the pin by turning the screw counter clockwise The...

Page 16: ...n and power up the PC laptop The Power LED shows a steady green light indicating that the SPECTROstar Nano is now turned On and in standby Double click the SPECTROstar Nano icon A window will appear a...

Reviews: