Bmax Technology B-MAX 100 Instructions For Use And Maintenance Manual Download Page 6

Bmax Technology 

A Division of Elmec Group S.r.l. 

 

Locality: Cà D’Oro 

36020 - Asigliano Veneto (VICENZA) - ITALY 

TEL. +39 0444-772023 - FAX +39 0444-773129  

E-mail: [email protected] - Web: www.b-max.com 

Elmec Group S.r.l. Tax code and VAT no.: 03725780245 

 

B-MAX BOILERS 

ENGLISH 

SAFETY 

1.2  SAFETY WARNINGS FOR THE USER 

 

 

The place where the boiler will be installed, hereby known as the installation location, MUST 
be installed in accordance with local, national and European regulations. The boiler is for heating and 

during operation its external surfaces are very hot. 

 

 

 

During operation, we recommend maximum caution and in particolar:  

 

 

 
Do not get too close to and do not touch the doors: DANGER OF BURNS 

 

 
Do not get too close to and do not touch the smoke exhaust: DANGER OF BURNS 

 

 

Do not carry out any cleaning when the boiler is On

 

 

 

 

Do not open the doors of the Boiler with the burner on

 

 

 
Do not remove the ash

 

 

Do not let Children or Animals go near the boiler  

 
OBEY ALL THE RULES SET OUT IN THIS MANUAL  
 

    Plus, to use the Pellet Boiler correctly:  

 



Only use the fuel which conforms to the manufacturer’s recommendations  



Observe the maintenance programme 



Carry out periodic clearing (only with the Boiler off and when the ash is cold)  



Do not use in the event of malfunctioning and anomalies 



Do not throw on water, not even to put out the fire in the burner brazier 



Do not turn off the Boiler by pulling out the plug from the socket 

(first turn off the burner and 

let it go through the shut-down cycle, then remove the plug from the main supply)  

 

Do not use wood or coal, 

only Pellets

 with the following characteristics:                       

 diam. 6 mm. - max. length 30

 

mm. - humidity 8 - 9 % 



Do not use the Boiler as an incinerator 



Carry out all operations with the maximum concern for safety 

 

 

17 

Bmax Technology 

A Division of Elmec Group S.r.l. 

 

Locality: Cà D’Oro 

36020 - Asigliano Veneto (VICENZA) - ITALY 

TEL. +39 0444-772023 - FAX +39 0444-773129  

E-mail: [email protected] - Web: www.b-max.com 

Elmec Group S.r.l. Tax code and VAT no.: 03725780245 

 

B-MAX BOILERS 

5.4  SPECIAL MAINTENANCE 

 
 
 

 

By Special Maintenance, we mean all the checking, cleaning and maintenance  
operations that should be carried out at least twice a year.  
These operations should be carried out both on the Boiler and on the Burner by  
qualified technicians with the training required by law. 
For maintenance of the Burner see the respective manual. 

 

CAUTION! Before starting any maintenance work, check that the plant is disconnected 
from the mains supply.   

 



Check the gaskets on the boiler and substitute them if damaged   



Check the  seals on the 3 doors  



Check the condition of the electric cables and their connections to the 
burner  

 



Check that the safety valve is working correctly (this should be done  
every 3 months) 

 



Analyse the combustion and record the data on the last pages of this 
manuel in the NOTES tables.  

 



Make a note of any components replaced on the same tables.   



Check the connection between the smoke duct and the chimney

 



Clean out the chimney

 



Remove the external pannelling and clean the body of the boiler   



Check all the connections of the hydraulic parts  



Clean out the inside walls of the boiler, both vertically and  

horizontally, and clean the heat exchangers situated in the upper part 

of the boiler  (See the diagram on Page 18). This should be carried 

out using the specific brush supplied with the boiler. 

 

 
 
 
 
 
 
 

ENGLISH 

MAINTENANCE 

Summary of Contents for B-MAX 100

Page 1: ... 773129 E mail info b max com Web www b max com Elmec Group S r l Tax Code and VAT no 03725780245 THE PRESENT MANUAL FORMS AN INTEGRAL PART OF THE BOILER AND MUST BE KEPT FOR FUTURE REFERENCE Pellet Boilers BEFORE USING THE BOILER IT IS OBLIGATORY TO READ AND UNDERSTAND THIS MANUAL IN ALL ITS PARTS Instructions for Use and Maintenance ...

Page 2: ...Manufactured Products Directive 2006 42 CE Machinery Directive ANY MODIFICATION OF THE BOILER WITHOUT THE PRIOR CONSENT OF Elmec Group S r l WILL RENDER THIS DECLARATION NULL AND VOID SPACE FOR MACHINERY IDENTIFICATION PLATE Elmec Group S r l Location Cà D Oro 36020 Asigliano Veneto VICENZA ITALY Date 01 02 2014 Managing Director Rev 00 Date 28 05 2014 B MAX BOILERS NOTES ENGLISH Bmax Technology a...

Page 3: ...S r l Tax code and VAT no 03725780245 B MAX BOILERS Dear Customer We thank you for choosing our product The B max Pellet Boilers can be connected to any type of heating system to Radiators Floor Skirting etc Our boilers have been exclusively studied to operate with wood pellets DIN quality 6 mm diameter Its structure is similar to a traditional wood boiler but it is far more economical It is extre...

Page 4: ...quirements indicated in the present Manual and in particular must Never use the system for purposes other than those indicated in this manual Always carry out constant diligent Maintenance as indicated in the various chapters Follow the safety regulations currently in force in the state in which the boiler is installed Never tamper with the plant Only use genuine spare parts Ensure that the instal...

Page 5: ...IT TO THE SMOKE EXHAUST ON THE BOILER Always use the safety devices and individual protection devices required in accordance with EEC Directive 89 391 Disconnect thepowersupplybeforecarryingoutanyoperations Always use suitable tools Before starting any work make sure that the combustion chamber is cold and that the ash is cold Also wait for the opening handles to cool down before touching them No ...

Page 6: ...e following characteristics diam 6 mm max length 30 mm humidity 8 9 Do not use the Boiler as an incinerator Carry out all operations with the maximum concern for safety 17 Bmax Technology A Division of Elmec Group S r l Locality Cà D Oro 36020 Asigliano Veneto VICENZA ITALY TEL 39 0444 772023 FAX 39 0444 773129 E mail info b max com Web www b max com Elmec Group S r l Tax code and VAT no 037257802...

Page 7: ...essary measures and to set up all the machinery and materials in such as a way as to ensure the correct and safe use of the equipment The present manual is in conformity with the latest regulations at the time of release onto the market It does not consider the machinery already on the market with its relative tecnical documentation deficient or inadeguate if eventual modifications or adjustments ...

Page 8: ...no Veneto VICENZA ITALY TEL 39 0444 772023 FAX 39 0444 773129 E mail info b max com Web www b max com Elmec Group S r l Tax code and VAT no 03725780245 B MAX BOILERS 5 0 TRANSPORT and MAINTENANCE 5 1 TRANSPORT The Boiler is delivered on a pallet and protected with bubble wrap or in a wooden box for larger models Transport loading and unloading Transport loading and unloading must be carried out wi...

Page 9: ...the safety devices or on parts of the Boiler or Burner 4 2 FIRST START UP AND SHUT DOWN When starting for the first time some of the oil and grease that coat the combustion chamber will tend to evaporate The room must be aired to allow these fumes to exit For the Start Up proceed as follows 1 Make sure that the Boiler is connected to the Hydraulic system 2 Connect the Burner to the mains 3 Ignite ...

Page 10: ...r l Tax code and VAT no 03725780245 B MAX BOILERS 3 7 INSTALLING THE BURNER ON THE BOILER For questions of size distance and safety the Burner is supplied separately from the Boiler To install the Burner follow the instructions below 1 Insert the support collector 2 onto the 4 M8 pins 1 welded onto the Boiler door 2 Fix on the collector 2 using the M8 nuts 3 3 Completely insert the burner into the...

Page 11: ...o the hydraulic system the heating plant and the boiler must be filled Before this operation it is necessary to check the hardness of the water and of water residue and if needed install for example if there is water with a fixed residue greater than 300 mg l at 180 C a water softener before the entry point of the water supply pipe This will ensure optimal conservation of the inside surfaces of th...

Page 12: ...tart upoftheplant foradurationofnotlessthan 30minutes tocheckthegeneraloperationalstateoftheequipment When the installation is completed and after the first start up of the plant the installer must consign the following documentation to the client The machine use and maintenance manual if not present inside the machinery The necessary documentation in compliance with existing laws TECHNICAL DESCRI...

Reviews: