Split Phase System
Connect two AC500 together with the P030A split phase fusion box and communication cable.
Go to ‘Advanced Setting’ , tap ‘Next’ and set both AC500 to ‘split phase’.
Choose one to be the ‘Master’ unit, the other ‘Slave’.
If the connection fails, clear the alarm history and reconnect.
* L1/L2: Line, 3-phase N: Neutral PE: Protective earth.
Note:
The system can be turned on/off ONLY on the ‘Master’ unit.
WARNING:
With the split phase P030A fusion box, the output power of both ‘Master’ and ‘Slave’
units can be set to a maximum of 3600W. Otherwise, it will cause damage to the EP500
and fusion box.
If you insist on charging AC500 in the system, ensure the sequence of L1, L2, and N wires*
is correct.
*1 NEMA L14-30 receptacle, 30A
*2 NEMA TT-30 receptacle, 30A
*4 Standard AC receptacle, 20A
4+>:
6
HWWLQJV
(')1
4+>:
(')1
6LQJOH3KDVH
6SOLW3KDVH
4+>:
6
HWWLQJV
(')1
4+>:
(')1
0DFKLQH$GGUHVV
0DVWHU
6ODYH
0DVWHU
Summary of Contents for AC500
Page 1: ...BLUETTI AC500 User Manual ...
Page 28: ...P N 17 0303 0461 00A0 ...