AL2 Lift Series

 

Quick Reference Sheet 

-

 Primary and Secondary Guying

 

DEPLOYMENT

 

[email protected]

 

Read Manual Before Use 

Refer to detailed instructions in the 

AL2 Lift Series Manual at all times 

 

Start at the center of the tripod and unwind the guy rope while walking 
away from the mast. Take one 

NORMAL

 step for each meter of height 

of the mast. 15M = 15 Steps. One person should deploy all 4 guy ropes. 

Add the red primary guy ring 
and pin it to the bottom hole on 

the mounting pole. 

Attach and secure your devices 
to the mast. Use velcro straps 

to secure any cables. 

 

Stop - unwind the guy rope, drive 
a stake into the ground at an 

angle and attach the guy rope. 

 

Add the mounting pole (1/2 the 
size of a mast pole) to the top of 

the mast pole. 

Slide the blue secondary guy 
ring onto the mounting pole.  

DO NOT 

lock it at this time. 

Secure the tripod by driving  
stakes through the two holes on 

each of the 3 tripod base plates. 

Release the cam lock on the 
bottom of the tripod. 

Insert first mast pole leaving at 
least 4 Inches above the tripod 

and lock the cam lock. 

Unfold the tripod legs and make 
sure the cross bars are locked 

into position. 

L

oosen turn knobs on each 

the tripod legs and allow them 

to fully extend. 

Make sure the base plates are 
flat on the ground and tighten 

the turn knobs. 

Level the tripod by using the 
three bubbles levels and adjust-

ing the tripod legs. 

Stand the tripod up with the 
base plates on the ground and 

release the Velcro Strap. 

1

 

2

 

3

 

4

 

5

 

6

 

8

 

9

 

7

 

10

 

14

 

13

 

12

 

11

 

18

 

16

 

15

 

17

 

Slide the handle towards the mast approx. 7 feet. This will take up the 
slack in the guy rope during deployment and prepare you for incremental 

guying. Repeat this process until all 4 guy ropes are 90 degrees apart. 

Attach the 1st primary guy rope 
to the round hole on the red 

primary guy ring. 

Attach  the  winch  handle.  Pay 
out  the  cable  by  turning  the 

winch handle counter clockwise 

01

/1

The cable should hang freely on 
the  left  side  of  the  winch  and 

should not hang over anything. 