
Installation and Operation Manual
Blue Sky Energy | USA |
www.blueskyenergyinc.com
8
BATTERY CHARGE PARAMETERS Menu
From Setup menu
FIGURE 5
SET ACCEPT CHG
14.4V SEL
►
Sets Absorption charge voltage setpoint.
Range 10.0 to 80.0V.
SET FLOAT CHG
13.4V SEL
►
Sets Float charge voltage setpoint.
Range 10.0 to 80.0V.
SET ACCEPT TIME
2.0HRS SEL
►
SET FLOAT CURENT
1.5A/100AH SEL
►
Sets Float Transition Current. Range 0.1 to 10.0A per 100 AH. A setting of
0 (zero) disables function such that full charge is based on Absorption
charge time only. See charge controller operators manual.
SET EQUALIZ CHG
15.2V SEL
►
Sets Equalize voltage setpoint.
Range 10.0 to 80.0V.
SET EQUALIZ TIME
2.0HRS SEL
►
Sets Equalize time.
Range 0.5 to 10 hours.
SET AUTO EQUALIZ
30DAYS SEL
►
Sets days between automatic Equalize. Range is 10 to 400 days. Fully
MANUAL equalization is selected by a setting of less than 10 days.
SET T-COMP SLOPE
-5.00mV/C/C SEL
►
Sets charge voltage temperature compensation factor.
Range is -0.00 to -8.00mV/
C/cell.
Sets Absorption charge time.
Range 0.0 to 10.0 hours.