Blue Hawk 55445 Manual Download Page 2

MOUNTING INSTRUCTIONS

MOUNTING S-HOOKS AND PEGS/

CARE AND MAINTENANCE/

From time to time, check all hardware to make certain it is still fully tightened.

1

2

3

4

5

MOUNTING RAILS SEPARATELY

1.Locate wall studs with a stud finder and mark the locations with a pencil.
  

To gain more space, alternate tool handles, one tool handle end up, one tool handle end down.

4.S-hooks: Slide hook (C) through hole in slot until hook protrudes from other end of slot.

5.Press peg (D) into keyhole slot. Be sure peg is in all the way. To remove, pull peg straight out.
 

2.Place the rail (A) at desired height aligning it with the studs. Place the side with 2 screw holes 
   to the left. Loosely mount the left end of the rail with one screw (AA). Level the rail (A), cover 
   the opposite end with end cap (B) and screw (AA) this end in fully. Go back and fully tighten 
   first screw (AA) and insert 2 remaining screws (AA), making sure all screws (AA) are fully 
   tightened. Use anchor with any screws (AA) that do not hit a stud.

3.Place the rail (A) at desired height, aligning it with the studs. Place the side with 2 screw holes to 
   the left. Loosely mount the left end of the rail with one screw (AA). Level the rail (A), cover the 
   opposite end with the left side of the next rail in the line and screw (AA) this end in fully. Repeat 
   this procedure until desired rail length is obtained. Cover end of last rail (A) with end cap (B) and 
   screw it in. Use anchor (BB) with any screws (AA) that do not hit a stud.

Reviews: