BLOTZ B20-MD-004 Quick Start Manual Download Page 1

 

20mm Saddlery floor for use with Open Fronted Barn 
B20-MD-004 

 
Please read these instructions fully before starting construction. 
PVA or equivalent glue will be required to stick sections together. 

Sand paper can be used to gently clean any joints. 
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and remember 
to cut away from yourself at all times. 
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place while 
you allow glue to dry. 
 
You may find it easier to paint portions of this model 

BEFORE

 construction 

 please see the end of the document for info 

about this. 
 

Upper Floor (Saddlery) 

 

Remove the door and handle from the sprue and 

glue them together as shown. 

 

 

Take the floor and upper walls from the sprue (as 

seen above). 

 

Glue the walls to the floor with all the etched 

detail facing inwards. 

 

 

Take the frameworks. 

 

Add the frames. Starting with the door 

framework, glue this into place aligning the door 

supports into their spaces.  

Note: This piece will be flush to the left hand side 

of the wall and extend out by about 3mm on the 

right. Move around the building adding each 

frame in turn. 

 

 

Glue one of the door supports to the base of the 

doorway with the hole on the left (see pic) 

Reviews: