10mm Monorail Station
(Double Platform)
B10-MW-113
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due
care and remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold
pieces in place while you allow glue to dry.
Start by removing the support pillar pieces from
the sprue. The image shown above is for a single
support pillar.
Glue the pieces together as shown above, with the
slots being opposite each other. Repeat for the other
three pillars.
Glue the lugs at the bases of two pillars into the
base. Repeat for the other pair of pillars and their
base. Allow glue to dry. Note the slots on the top
of the supports run along the length of the base
(see above)
Now take the two platform pieces and the seven
stanchions from the sprue.
Each of the roof supports is formed from four pieces
(shown above). Glue them together as shown with the
slots opposite each other. Allow to dry.