background image

10mm 3x2 Industrial Middle 

B10-CS-253 

 

Please read these instructions fully before starting construction. 

PVA or equivalent glue will be required to stick sections together. 

Sand paper can be used to gently clean any joints. 

A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due 

care and remember to cut away from yourself at all times. 

During the construction of this model, you may find it convenient to use pegs / elastic bands to hold 

pieces in place while you allow glue to dry. 

 

Mid-Section (B10-CS-253) 

 

Remove the four wall sections and corner bracers 
from the sprue as shown above. 
 

 

Glue two corner bracers to the back of the two short 
wall sections. Allow glue to dry. 
 

 

Glue the two side walls to the end walls as shown 
above. 
 

 

Now remove the four decorative sections from the 

sprue. 

 

Glue these into position on the main walls using 

the lines scored on the walls as a guide. 

 

Glue the four supports in place – the two longer ones 

on the end walls and the short ones in the centre of 

the long walls. 

 

Reviews: