background image

1. Introducing the Battery Simulator 1200 

Bloomy Energy Systems 

Battery Simulator 1200 Installation Manual 

 

Figure 2: Rear View of Battery Simulator 1200 

The outputs of the Battery Simulator 1200 may be connected in series to simulate a pack. This must be 

done with extreme caution as hazardous voltages can be generated due to the additive nature of the cell 

outputs. For example, 12 cells in series with each cell at 4 volts will generate 48V total. 
 
 

   WARNING 

Hazardous voltages can result from connecting outputs in series. Use extreme caution when 

connecting outputs in series.  

Failure to follow the instructions given can result in death or serious injury 

 
 
 

 

Summary of Contents for Battery Simulator 1200

Page 1: ...Battery Simulator 1200 Installation Manual Bloomy Energy Systems 8700 00001 V1 1...

Page 2: ...ss A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environm...

Page 3: ...ation which if not avoided could result in death or serious injury Failure to follow the instructions given can result in death or serious injury CAUTION CAUTION indicates a potentially hazardous situ...

Page 4: ...1 Introducing the Battery Simulator 1200 5 1 1 Features 5 1 2 Application Example 7 2 Installation 8 2 1 Wiring Remote Sense 10 3 Specifications 11 3 1 Cell Simulation 11 3 2 Auxiliary I O Specificat...

Page 5: ...to be configured for custom battery profiles and simulated events Multiple units can be combined in series to simulate higher channel count battery packs 1 1 Features Simulate 12 independent cells per...

Page 6: ...imulate a pack This must be done with extreme caution as hazardous voltages can be generated due to the additive nature of the cell outputs For example 12 cells in series with each cell at 4 volts wil...

Page 7: ...o integrate the Battery Simulator 1200 into many custom system architectures In the example shown below two units are stacked above a 680V external power supply to provide an overall pack voltage of 8...

Page 8: ...ct device near the equipment and within easy reach of the operator CAUTION DO NOT open the equipment enclosure This product contains no user serviceable components Failure to follow these instructions...

Page 9: ...n 1 Pin 2 Analog In 3 Pin 3 Analog In 5 Pin 4 Analog In 7 Pin 5 GND Pin 6 Analog Out 1 Pin 7 GND Pin 8 Digital I O 2 Pin 9 Digital I O 4 Pin 10 Digital I O 6 Pin 11 Digital I O 8 Pin 12 GND Pin 13 CAN...

Page 10: ...attery Simulator 1200 and the device under test To set up the remote sensing mode refer to Figure 3 Wiring Remote Sense and follow these steps 1 Connect a pair of sense leads from Sense and Sense to t...

Page 11: ...ates linearly under 2 V Current Resolution 0 1 mA Isolation 1000 VDC CH TO CH CH TO GND Control Communication LAN Ethernet CAN optional Drivers NI LabVIEW Readback Voltage Resolution 1 mV Voltage Accu...

Page 12: ...allation Manual 3 3 Physical Specifications Dimensions 19 W x 1 75 H x 15 D 1U 482 6 mm W x 44 5 mm H x 381 0mm D Weight 7 5 lb 3 4 kg Operating Temperature 0 to 35 C Input Power Single phase 100 240...

Page 13: ...y Simulator 1200 Installation Manual Bloomy Energy Systems 13 4 Maintenance 4 1 Cleaning Instructions To clean your Battery Simulator 1200 follow these steps 1 Power down the unit 2 Clean with a damp...

Page 14: ...Battery Simulator 1200 Installation Manual Bloomy Energy Systems 14...

Reviews: