
7
INSTALLATION (continued)
CAUTION:
Electric Shock
Hazard
The ground prong of the
electrical plug is part of a
system designed to protect
you in the event of equipment
damage. Never cut off the
large prong of the plug, nor
twist a blade to fit an existing
receptacle. Contact an
electrician to install the
proper electrical circuit and
receptacle.
IMPORTANT:
Initial set-up must be performed
by a qualified installer or
qualified service technician.
Improper set-up will damage the
brewer and void the warranty.
IMPORTANT:
DO NOT CONNECT POWER
TO DOCKING STATION WITH
SATELLITES IN PLACE.
ELECTRICAL INSTALLATION INSTRUCTIONS
This unit requires a power source capable of supplying
120 Volts AC, 50/60 Hz, 3-Wire 15 Amp.
The unit is shipped from the factory with a power cord.
The power cord must be plugged into a properly grounded
NEMA 5-15P receptacle.
INITIAL SET-UP INSTRUCTIONS
Remove all satellites from the docking station. Plug power cord
into an appropriate 120 volt receptacle.
Install a satellite in docking position #1. When properly installed,
the indicator light will glow.
NOTE:
For units equipped with quality timers, there will be a
slight delay before the indicator light glows.
Repeat indicator check for positions #2 thru #5.
Docking station is ready for service.