Installing the Hub Module
Refer to Chapter 6, “
Installing the Modules (General)
” and perform these steps to properly install the
Hub Module (HM). Typically, the factory installs most of the components on to the module; however
these instructions are for when the module requires field assembly.
Figure 28, “Hub Module Showing All Connectors” shows the HM with all HM connectors indicated. The
Radio Frequency (RF) cables run from the HM to the RF Beam Steering Antenna.
Figure 28 Hub Module Showing All Connectors
7.1
Adjusting the Hub Module
Typically, you do not need to adjust the HM, but if needed (i.e., to correctly position an antenna), the
mounting brackets offer three degrees of adjustment: elevation up-tilt up to 30 degrees, azimuth up to
+/- 25 degrees and theta of up to +/-10 degrees. In addition, the Beam Steering Antenna allows a down-
tilt adjustment capability of 0-10 degrees.
Prerequisites:
Attached elevation and azimuth brackets on back of HM
Mounted pole/wall mounting bracket
Required parts and tools:
Black marker
Ratchet wrenches, ½ in. and 7/16 in.
Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets
Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft
Antenna Control
Interface
Connector
RF Cable Connections
(N-Type x4)
Power
Ethernet (RJ45)
SFP Housing
Grounding Lug
Antenna Bracket
Mounting Points
GPS Antenna
(Top center)
Status LED